Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2021 at 8:00 PM
Updated August 14, 2025
Renovation of an educational facility in Mill City, Oregon. Completed plans call for the renovation of a educational facility.
The work consists of: Roof project includes, but is not limited to, the complete removal and replacement of the existing defined low slope roof assemblies and the installation of new vapor retarder; insulation; coverboard; SBS modified adhesive applied roof system; sheet metal and all incidentals to complete the work for the specified warranted assemblies. Unsuccessful bidders will have their security refunded to them when the contract has been awarded. Any objections to or comments upon the bid specifications must be submitted in writing to the attention of Mr. Steve Earle, Program Manager, HMK Company, PO Box 1176, Albany, OR 97321. To be considered, such objections or comments must be received at least FIVE (5) working days before the bid closing date. No bid for a construction contract shall be received or considered by the public contracting agency unless the bidder is licensed by the Construction Contractors Board of the State of Oregon as required by ORS 701.035 and 701.055. Each bid must identify whether the bidder is an Oregon resident bidder, as defined in ORS 279A.120. Bidder's attention is directed to compliance with ORS 279C.370 regarding submission of the First-Tier Subcontractor Disclosure Form. If the contract amount exceeds $100,000.00, the First-Tier Subcontractor Disclosure Form will be required and may be submitted either with the bid or within two (2) hours after the bid closing time and date at the bid site address. Failure to provide the First-Tier Subcontractor Disclosure Form may result in bid rejection. The District reserves the right to reject any or all bids, to waive formalities, and to postpone the award of the contract for thirty (30) days. All bids and all prices quoted in bids shall be firm for a period of thirty (30) days after the bid closing date.
Post-Bid
Educational
$250,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2021
June 28, 2021
150 SW Evergreen St, Mill City, OR
Related To This Project
Mill City, OR
Bid Date: Aug 07 2025
Mill City, OR
Bid Date: May 27 2025
Mill City, OR
--
Mill City, OR
Bid Date: May 09 2025
Mill City, OR
Bid Date: Mar 13 2025
Mill City, OR
Bid Date: Dec 05 2024
Mill City, OR
Bid Date: Dec 05 2024
Mill City, OR
Bid Date: Nov 21 2024
Mill City, OR
Bid Date: Jun 12 2024
Mill City, OR
Bid Date: Mar 05 2024
Mill City, OR
Bid Date: Dec 19 2023
Mill City, OR
Bid Date: Feb 09 2022
Mill City, OR
Bid Date: Sep 18 2023
Mill City, OR
Bid Date: Jun 03 2021
Mill City, OR
Bid Date: Sep 01 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
