BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in De Pere, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

Proposals from experienced contractors to resurface and renovate the tennis courts at VFW Park from three tennis courts to two tennis courts and two pickle ball courts. VFW Park is located at 730 Grant Street in De Pere, WI. Proposals will be accepted for the work tasks described in this proposal. Price quotes shall be all-inclusive and represent the completion of all tasks necessary to appropriately resurface the facility and to convert one of the tennis courts into two pickle ball courts. The accepted proposal and firm shall be responsible for all parts, labor, and other associated equipment and/or tasks necessary to complete the resurfacing and renovation of one of the courts. The current tennis courts have not been resurfaced in about 9 years. Although there is some cracking, the courts were inspected by the City Engineering Department, and it is felt the courts do not have to be milled. The City has allocated funding in the 2022 budget to conduct necessary tasks to resurface the facility and to convert one tennis court into two pickle ball courts. The contractor will be required to perform all tasks needed to provide a satisfactory product in resurfacing the facility and converting one tennis court into two pickle ball courts. Tasks will include, but not limited to: color coating surface removal, patching and/or filling all asphalt, ensuring a smooth surface void of bird baths, removal of posts from one tennis court, installation of standards for two pickle ball courts, installation of fence to section off pickle ball courts, installing new color coating surface, and painting lines in accordance with tennis and pickle ball standards. Contractors should review the specifications in developing a proposal(s) for consideration. The project is expected to be conducted in 2022, and be completed prior to August 1, 2022.

Bid Results

Playgrounds / Parks / Athletic Fields

$81,250.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
269
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

December 31, 2021

img_map_placeholder

730 Grant St, De Pere, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.