BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the remodel of a office development.

Milwaukee Public Schools will receive sealed quotations for furnishing all labor, tools, equipment and materials necessary, including public liability and property damage insurance to perform all work necessary and incidental to the Office Remodeling. The are no HUB, Student Employment / Participation requirements for this request for quotation. All questions should be submitted in writing prior to 12:00 PM on Thursday, June 17, 2021 to DFMSProcurement@milwaukee.k12.wi.us. No questions will be answered after that date and time. No questions will be answered verbally. No verbal information from any source is to be relied upon by any respondent in the development of their response to the RFP. Written questions and responses will be documented by way of addenda, which will be forwarded to all bidders. 1. Furniture and equipment to be removed by owner. 2. Remove and replace existing carpet and mastic and associated coverboard in Main Office Area Rooms 110, 110A and 108A as shown in attached drawings 3. Install new homogenous vinyl tile flooring at entrance Room 110 as shown in attached drawings. 4. Existing wood shoe molding to be removed prior to demolition and reinstalled once flooring is complete a. Notify Owner if existing shoe base cannot be reused. Owner will furnish new shoe base to match existing if necessary. 5. Existing vinyl base around built-in cabinetry to be removed where applicable. 6. Provide and install new 5-ply birch underlayment per attached specifications. 7. Provide and install new transition strips at all doorways and between new carpet and vinyl tiles and existing flooring as needed. 8. Install new 4" High vinyl base around all built-in cabinetry where existing base was removed. 9. Carpet Tile, Homogenous Vinyl Tile, Vinyl Base and all associated mastics to be supplied by owner. 10. Contractor to furnish underlayment, and appropriate transition strips (gray to match base). 11. Contractor shall paint all walls in Main Office 110 as indicated on drawings. Paint around all built in cabinetry, tack boards or other items permanently attached to the wall. Patch all holes in walls from pictures and other items removed. Two paint colors will be used, as shown on attached drawings. Previously painted wood picture rail will be painted to match wall color.

Bid Results

Office

$11,355.00

Public - City

Remodeling

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
51
Bidding Soon
1,242
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2021

July 12, 2021

img_map_placeholder

4348 S Griffin Ave, Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.