BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a bridge / tunnel in El Prado, New Mexico. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Award Details Contract Award Date: May 31, 2022 Contract Award Number: 6982AF22C000023 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: MONITOR CONSTRUCTION COMPANY, INC Contractor Awarded Address: Sonoita, AZ 85637 USA Base and All Options Value (Total Contract Value): $2842253.00 THIS IS NOT AN INVITATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT DETAILS: NM FLAP TAO B007(1) John Dunn Bridges PROJECT DESCRIPTION: The purpose of this project is to rehabilitate the John Dunn Bridge #5243 and replace Bridge #3807. The John Dunn bridge #5243 lacks routine maintenance and as a result exhibits some advanced protective coating loss at connections and areas along the primary truss chords. Bridge #3807, has been identified as structurally deficient and needs to be replaced with a new bridge. The work associated with John Dunn Bridge #5243 includes replacement of loose or bent railing with in-kind materials intended to match the original bridge construction, deck surfacing rehabilitation, timber member replacement, coating repair, and replacement of the steel truss. The work associated with Bridge #3807 includes removing the existing old bridge and building a new 50-foot precast bridge with new abutments, using a micropile foundation. John Dunn Bridge #5243 is located on road B007, and crosses the Rio Grande River. Bridge #3807 is also located on road B007, and crosses the Rio Hundo approximately 0.1 miles East of the John Dunn Bridge. The bridges are approximately 17 miles North of Taos, NM. PRINCIPAL WORK ITEMS: 134 CUYD of Structural Concrete, Class A 255 LNFT of Precast, Pre-stressed Concrete Slab. 11,600 LB Reinforcing Steel 6,500 LB Reinforcing Steel Epoxy Coated 1 LPSM Painting Steel Structure 488 LNFT of Micropile It is anticipated this project will be advertised in April, 2022. Construction is anticipated between June, 2022 and November, 2022. The proposed project is estimated at a cost between $2 million and $5 million. MISCELLANEOUS: All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,842,253.00

Public - Federal

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2022

June 9, 2022

Project location map

Co Rd B-007, El Prado, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.