Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2021 at 8:00 PM
Updated November 15, 2023
Site work for a water / sewer project in Woodward, Oklahoma. Working plans call for site work for a water / sewer project.
Any competitive bid submitted to the county for the furnishing of goods or services must be submitted on Form S.A.&I-4040 (1982) and the non-collusion statement completed. They will reserve the right to reject any or all bids. Contractor shall, in a good and first-class, workmanlike manner, at its own cost and expense, furnish all labor, materials, tools and equipment required to perform and complete said work in strict accordance with the Bidding Documents, with the following additions and/or exceptions: (if none, so state.) The 10' diameter steel pipe structure shall be built within the existing county right-of-way. The pipe shall be 40' long with a minimum wall thickness of 1/2 inch. The roadway over the pipes shall be a minimum width of 28' wide with foreslopes no greater than a 1:2 slope. Removal of Existing Structure includes all cost to remove and dispose of the existing pipe structure and wingwalls. The existing rock/concrete structure is to remain in place. The 10' diameter steel pipe shall be installed flush against the East side of the concrete structure. A concrete collar shall be poured around the connection of the steel pipe and existing concrete structure. The collar shall be minimum of 12" thick and 2' wide for the full circumference of the pipe. The flowline elevations of the pipe shall slope from the high side on the West to the low side on the East. The pipe shall be backfilled in no more than 8" lifts to a minimum density of 95% of the standard density. The backfill shall extend a minimum of 1' above the top of the pipe. Pipe Backfill and Earthwork includes all costs to prepare the site for pipe installation, to backfill around the pipes to the elevation of the existing roadway or one foot over the pipes, whichever is greater. The price bid also includes any borrow material that may be needed to build the structure to specifications. Rock Surface includes the cost of placing, grading, an
Final Planning
Water / Sewer
$500,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 14, 2021
July 14, 2021
To Be Determined, Woodward, OK
Related To This Project
Woodward, OK
Bid Date: Nov 30 2020
Woodward, OK
--
Woodward, OK
Bid Date: Feb 11 2019
Woodward, OK
Bid Date: Nov 30 2020
Woodward, OK
Bid Date: Nov 29 2023
Woodward, OK
Bid Date: Nov 29 2023
Woodward, OK
Bid Date: Dec 04 2023
Woodward, OK
Bid Date: Apr 08 2024
Woodward, OK
--
Woodward, OK
--
Woodward, OK
Bid Date: Mar 22 2022
Woodward, OK
Bid Date: Feb 14 2022
Woodward, OK
Bid Date: Feb 22 2022
Woodward, OK
Bid Date: Jan 24 2022
Woodward, OK
Bid Date: Jan 24 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
