BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a transportation facility in Santa Maria, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Sealed bids will be received by the Santa Maria Public Airport District for furnishing all plant, labor, services, materials, tools, items, and facilities necessary therefore, as provided in the contract documents, for a project entitled Rehabilitate Parallel and Connecting Taxiways A, A7, A8, V AND W in strict accordance with the contract documents and plans and specifications on file at the office of the General Manager of the District, 3217 Terminal Drive, Santa Maria, California 93455. Documents can be viewed at the office. Description of Work - The work comprises of the following: Site preparation including clearing, grubbing, demolition and removals. In-place grind of existing structural section, temporary stockpile, place back into section. Earthwork and subgrade preparation. Construct new structural section including recycled material, aggregate base and asphalt pavement. Trenching, backfill, and compaction. Installation of airfield electrical systems including conduit, conductor, edge lights and guidance signs. Airfield pavement marking. Construction site environmental control including storm water management. Hydro-mulch erosion control. License Requirements - The type of contractor's license required is Engineering A. The minimum wages to be paid for labor shall not be less than the general prevailing per diem wage and rates for overtime and general holidays as determined by the Director of the Department of Industrial Relations, State of California, pursuant to California Labor Code Sections 1770, 1773, and 1773.1, which wage rates are available for inspection at the District office. This is a Federal project and compliance with the Secretary of Labor wages is also required Proposal Guarantee - Each bid shall be accompanied by a certified check, cashier's check, or surety bid bond made payable to the District, in an amount equal to at least 10% of the amount of the total bid, and no bid shall be considered unless said check or bid bond is enclosed therewith said amount to be forfeited to the District, should the bidder to whom the contract is awarded fail to enter into the contact in accordance with his bid proposal and submit the required bonds in an amount equal to the full amount of the bid price, as referred to in paragraph below titled "Contract and Payment Bonds", within 10 days after being mailed notice of such award and contract for execution Contract and Payment Bonds - The Contractor shall deposit with the District a surety bond guaranteeing faithful performance of the contract, and a surety bond guaranteeing payment for all labor, materials, rentals, etc. Each bond shall be in an amount equal to 100% of the amount of the contract, shall be on forms prescribed by the District, and shall be executed by a corporate surety licensed to do business in California. Each bidder shall furnish the District with satisfactory evidence of his competency to perform the work contemplated. The District reserves the right to reject a bid if the bidder has not submitted a statement of his qualifications prior to the date of the opening of the bids. Bidders must submit their qualifications prior to or with submission of the bid. The bidders will be required to furnish a statement covering experience on similar work, and a list of machinery, plant and other equipment available for proposed work. The District reserves the right to make such investigation of information submitted as is deemed necessary, before a rating is given, and to disqualify any contractor from bidding if deemed in the best interest of the District. The contract award, if made, will be made within one hundred twenty (120) days after opening of bids. No bidder may withdraw his bid within said period. The work shall commence within 10 days after receiving a written notice to proceed and shall be prosecuted diligently. The work shall be completed within the following time frame(s): Base Bid: 180 Working Days Additive Alternate A An additional 60 Working Days (240 total) If the Contractor refuses or fails to complete the work within the time specified, including authorized extensions, there shall be deducted from monies due the Contractor, not as a penalty but as liquidated damages, the sum of $1,200.00 for each calendar day subsequent to the time specified and until the work is completed and accepted up to and including thirty (30) calendar days past the date established for completion. Contractor shall pay to District the sum of $2,000.00 per calendar day as liquidated damages for each calendar day that Project shall remain incomplete past thirty (30) calendar days after the date established for completion. DBE Requirements - This is a federally funded project with a grant issued through the Federal Aviation Administration (FAA). The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of this project. The DBE goal for this project is 8.75%. llows: Goals for minority participation for each trade: 19.7% Goals for female participation in each trade: 6.9%

Award

Transportation Terminals

$7,992,353.00

Public - City

Paving, Site Work

40

16

5

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
46
Bidding Soon
545
All Active Projects
253
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 8, 2022

February 6, 2023

img_map_placeholder

3217 Terminal Dr, Santa Maria, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.