BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a sidewalk / parking lot in Toledo, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Metropolitan Park District of the Toledo Area (Owner) is seeking qualifications statements from Ohio Department of Transportation (ODOT) prequalified firms to provide Construction Manager at Risk (CMAR) services for construction of Better Utilizing Investments to Leverage Development (BUILD) grant funded portions of the Glass City Riverwalk, within the City of Toledo (the Project. In general, The CMAR shall work cooperatively with the Engineer of Record and any other consultants to the Project that may be retained by the Owner and provide, among other services, cost estimating, budgeting, value engineering, constructability review, scheduling and planning ultimately arriving at an agreed-to guaranteed maximum price and constructing the Project. The planning & construction budget for this project has been set at approximately thirty million dollars. The Metropolitan Park District of the Toledo Area will directly select the top three firms based on the Qualification Statements; those top three firms will subsequently be asked to respond to a Request for Proposals. The Project budget is approximately thirty million dollars, including both planning and construction. Current designs are conceptual and undeveloped. Construction is expected to start by March, 2023, and substantial completion is targeted for June, 2025. Metroparks is currently/simultaneously soliciting for consultant services to support the project on behalf of the Owner, including: landscape architecture / engineering services in order to place The Engineer of Record; an Independent Estimator, and a Construction Administration consultant. A project surveyor and environmental consultant have already been placed on the project directly by Metroparks Toledo

Bid Results

Sidewalks / Parking Lot

$30,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
101
Bidding Soon
1,287
All Active Projects
543
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2021

March 1, 2023

img_map_placeholder

983 Front St, Toledo, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.