Renovation of a power facility in Gilboa, New York. Completed plans call for the renovation of a power facility.
**As of August 12,2021 the project has not been awarded. A timeline for the award is not yet established.** NYPA is seeking proposals for the enhancement of one of the constant level ponds at Blenheim-Gilboas Upper Reservoir. The enhancement work will include, but is not limited to, the furnishing and installation of fish attraction structures. At this time, a pre-bid tour is not planned. Due to summer operations at the B-G Power Plant, most of the work area in the Upper Reservoir will be inundated with water. However, the B-G Upper Reservoir, accessed by Kingsley Road, Gilboa, NY, is open to the public during daylight hours. Visitors are asked to call NYPA security 800-724-0309, prior to their arrival if they plan to launch a non-motorized boat. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Contract term: 9 MONTHS The work covered under these specifications consists of furnishing all plant, supervision, labor, materials and equipment (except for services, materials, and/or equipment to be furnished by others as specifically referred to in the Contract Documents), and performing all operations required for the Habitat Improvement Project at the Blenheim Gilboa Power Project Upper Reservoir including, but not limited to the following: 1. Mobilization and Demobilization, Phase 1. 2. Site Access and Preparation, Phase 1: All labor, materials, equipment, and incidentals to prepare site for construction, establishment and maintenance of temporary erosion and sedimentation controls, and proper disposal of all cleared organic materials. 3. Water Control, Phase 1: Develop a dewatering plan and provide all labor, materials, and equipment required to implement and maintain the plan. 4. Earthwork, Phase 1: All labor, materials, equipment, and incidentals for the excavation and dewatering of existing materials and the placement of new materials for the reconstruction of the constant level pond. Placement of soil-choked stone fill and coir fiber matting with a loam layer underneath. Proper disposal of spoils and unused materials. 5. Fish Attraction Structures, Phase 1: All labor, materials, and equipment to furnish and install fish attraction structures in the Upper Reservoir. 6. Mobilization and Demobilization, Phase 2. 7. Site Access and Preparation, Phase 2: All labor, materials, equipment, and incidentals to prepare site for construction, establishment and maintenance of temporary erosion and sedimentation controls, and proper disposal of all cleared organic materials. 8. Water Control, Phase 2: Develop a dewatering plan and provide all labor, materials, and equipment required to implement and maintain the plan. 9. Earthwork, Phase 2: All labor, materials, equipment, and incidentals for the placement of loam and coir fiber matting with a loam layer underneath. Proper disposal of spoils and unused materials.
Post-Bid
Power Plant
$150,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2021
August 2, 2021
397 Power Plant Access Rd, Gilboa, NY
Related To This Project
Gilboa, NY
Bid Date: Mar 12 2025
Gilboa, NY
Bid Date: May 15 2025
Gilboa, NY
Bid Date: Aug 07 2025
Gilboa, NY
Bid Date: Nov 19 2025
Gilboa, NY
Bid Date: Dec 09 2025
Gilboa, NY
Bid Date: Dec 09 2025
Gilboa, NY
Bid Date: Dec 09 2025
Gilboa, NY
Bid Date: Oct 31 2024
Gilboa, NY
Bid Date: Jul 22 2024
Gilboa, NY
Bid Date: May 10 2024
Gilboa, NY
Bid Date: Nov 09 2023
Gilboa, NY
Bid Date: Nov 09 2023
Gilboa, NY
--
Gilboa, NY
Bid Date: Dec 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.