Renovation of a power facility in Gilboa, New York. Completed plans call for the renovation of a power facility.

**As of August 12,2021 the project has not been awarded. A timeline for the award is not yet established.** NYPA is seeking proposals for the enhancement of one of the constant level ponds at Blenheim-Gilboas Upper Reservoir. The enhancement work will include, but is not limited to, the furnishing and installation of fish attraction structures. At this time, a pre-bid tour is not planned. Due to summer operations at the B-G Power Plant, most of the work area in the Upper Reservoir will be inundated with water. However, the B-G Upper Reservoir, accessed by Kingsley Road, Gilboa, NY, is open to the public during daylight hours. Visitors are asked to call NYPA security 800-724-0309, prior to their arrival if they plan to launch a non-motorized boat. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 10% Women Owned Sub-Contracting Goal: 10% Service-Disabled Veteran-Owned Business Contracting Goal: 3% Contract term: 9 MONTHS The work covered under these specifications consists of furnishing all plant, supervision, labor, materials and equipment (except for services, materials, and/or equipment to be furnished by others as specifically referred to in the Contract Documents), and performing all operations required for the Habitat Improvement Project at the Blenheim Gilboa Power Project Upper Reservoir including, but not limited to the following: 1. Mobilization and Demobilization, Phase 1. 2. Site Access and Preparation, Phase 1: All labor, materials, equipment, and incidentals to prepare site for construction, establishment and maintenance of temporary erosion and sedimentation controls, and proper disposal of all cleared organic materials. 3. Water Control, Phase 1: Develop a dewatering plan and provide all labor, materials, and equipment required to implement and maintain the plan. 4. Earthwork, Phase 1: All labor, materials, equipment, and incidentals for the excavation and dewatering of existing materials and the placement of new materials for the reconstruction of the constant level pond. Placement of soil-choked stone fill and coir fiber matting with a loam layer underneath. Proper disposal of spoils and unused materials. 5. Fish Attraction Structures, Phase 1: All labor, materials, and equipment to furnish and install fish attraction structures in the Upper Reservoir. 6. Mobilization and Demobilization, Phase 2. 7. Site Access and Preparation, Phase 2: All labor, materials, equipment, and incidentals to prepare site for construction, establishment and maintenance of temporary erosion and sedimentation controls, and proper disposal of all cleared organic materials. 8. Water Control, Phase 2: Develop a dewatering plan and provide all labor, materials, and equipment required to implement and maintain the plan. 9. Earthwork, Phase 2: All labor, materials, equipment, and incidentals for the placement of loam and coir fiber matting with a loam layer underneath. Proper disposal of spoils and unused materials.

Post-Bid

Power Plant

$150,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
99
Bidding Soon
1,383
All Active Projects
689
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2021

August 2, 2021

img_map_placeholder

397 Power Plant Access Rd, Gilboa, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.