BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a mixed-use development in Sheppard AFB, Texas. Completed plans call for the construction of a 29,000-square-foot day care center; for the demolition of a 22,057-square-foot day care center; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Contract Award Date: May 06, 2022 Contract Award Number: W912BV22C0012 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: K9REEC338KM7 Contractor Awarded Name: Southwind Construction Services, LLC Contractor Awarded Address: Edmond, OK 73013-3633 USA Base and All Options Value (Total Contract Value): $19875475.00 Applicable item: HVAC Chiller / Proposed Make: Trane Inc. HVAC Sheppard AFB, Texas This is a PRE-SOLICITATION NOTICE for the construction project consisting of the design-build construction of a new child development center at Sheppard AFB, Texas. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers - Tulsa District has been tasked to solicit for and award a contract for the design-build construction of a new child development center at Sheppard AFB, Texas. The proposed project will be a competitive, firm-fixed price, two-phase design-build contract procured in accordance with FAR 15, Negotiated Procurement using the trade-off process. Project Description: This project will be a design-build construction project for an approximately 29,000 square foot child development center, including FEMA Storm Shelter and playground and supporting infrastructure. Demolish the existing adjacent CD C that is 22,057 SF. Construction plans and building information model up to 35% Design will be provided, including topographic survey and geotechnical report. Construction includes reinforced concrete foundations, concrete floor slab, split faced concrete masonry unit facade and a standing seam metal roof. The project includes all utilities, site improvements, pavements, detection /protection features, security enhancements and other supporting work necessary to make a complete and useable facility. Facilities will be designed as permanent construction in accordance with DoD Unified Facilities Criteria (UFC) 1-200-01. This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01. In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated magnitude of construction for this project is between $10,000,000 and $25,000,000. The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $39.5M. This requirement will be solicited as unrestricted. Estimated duration of the design phase of this project is 190 calendar days, and the construction phase of is 540 calendar days. Anticipated solicitation issuance date for Phase 1 is on or about 23 June 2021, and the estimated proposal due date will be on or about 23 July 2021. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Day Care Centers

$19,875,475.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
10
Bidding Soon
261
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2021

May 3, 2022

img_map_placeholder

To Be Determined, Sheppard AFB, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.