BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2021 at 8:00 PM

Updated April 15, 2024

Site work for a water / sewer project in Milford, Iowa. Completed plans call for site work for a water / sewer project.

The project consists of furnishing all labor, materials, and equipment necessary to complete the installation of 8-inch diameter gravity sewer as shown per contract documents. Approximately 3,950 linear feet via open cut construction of 8-inch diameter AWWA C900 DR18 PVC pipe, 3,560 linear feet via Pilot Tube Microtunneling (PTMT) of 8-inch diameter AWWA C900 DR18 PVC pipe with steel casing pipe, manholes, sewer service stub outs, storm sewer pipe, temporary roadway surfacing, asphalt pavement, and sitework, together with related subsidiary and incidental work in accordance with the plans and specifications.

Award

Water / Sewer

$6,122,778.00

Public - State/Provincial

Site Work

58

13

4

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
56
Bidding Soon
492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2021

July 26, 2021

Project location map

Multiple Locations, Milford, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.