BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 5, 2022 at 7:00 PM

Updated September 15, 2023

Site work, paving and new construction of a civil project in Navajo Dam, New Mexico. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Contract Award Date: Jan 03, 2022 Contract Award Number: 6982AF22C000007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 158155411 Contractor Awarded Unique Entity ID (SAM): P91BMWKMW825 Contractor Awarded Name: J. Star Enterprises, Inc. Contractor Awarded Address: New Orleans, LA 70119-1147 USA Base and All Options Value (Total Contract Value): $3250949.20 HFLCEO210380PR, 104000-001 PROJECT DETAILS: NM FLAP SJU 10(1) Cottonwood Campground Bridge THIS PROJECT IS ADVERTISED AS A TOTAL SMALL BUSINESS SET-ASIDE. THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT DESCRIPTION: The project is to provide an accessible and maintainable roadway to the campground, a bridge will be constructed to span the width of the arroyo to the north of the existing roadway at the arroyo crossing, and will be elevated high enough to allow for the park service to continue to use maintenance equipment to keep the arroyo clear of excessive sediment accumulation. The new bridge will be constructed offline such that access to the campground will be maintained without interruption to traffic flow. The alignment of the roadway will be reconstructed upon completion of the bridge with profile adjustments as necessary to meet the deck elevation of the new bridge. SIGNIFICANT QUANTITIES: 3,950 cubic yard of embankment construction 2,120 cubic yard of placed riprap, class 3 1,220 cubic yard of placed riprap, class 4 194 cubic yard of structural concrete class A 430 liner feet precast prestressed concrete girder 186 liner feet of drilled shaft 36-inch diameter MISCELLANEOUS: The proposed work for this project includes installation of a new bridge which will free span the arroyo crossing. The new bridge is proposed to include two 12 foot lanes by 105 feet long with 4-foot-wide shoulders and metal railings for a total out to out width of 35 feet. All of the work is occurring in cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. COST RANGE: The proposed project is estimated at a cost between $1,500,000 and $3,500,000. CONSTRUCTION DURATION: Construction is anticipated from FALL 2021 to April 2022. The price range of the project work is between $1 and $3 Million. ADDITIONAL INFORMATION: Anticipated Award: Late November 2021 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$3,250,949.00

Public - Federal

New Construction, Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
80
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

January 6, 2022

Project location map

To Be Determined, Navajo Dam, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.