Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a mixed-use development in Edgefield, South Carolina. Completed plans call for the construction of a 66,000-square-foot fire / police facility; and for site work for a detention facility.
https://www.postandcourier.com/aikenstandard/news/edgefield-county-officials-break-ground-on-new-law-enforcement-center/article_02f959a6-6ece-11ed-89c9-976c358a8c79.html Egefield County Officials broke ground Nov. 23 for the new Edgefield County Law Enforcement Center. The LEC construction now begins in earnest. The construction is expected to be about 18 months. The LEC, located off Rabbit Trail Road near Edgefield, will likely cost approximately $42 million to build and outfit. The state is contributing $18 million to the project from the plutonium settlement money, which was added at the request of the Edgefield County Legislative Delegation. The rest of the funding will come from the Capital Project Sales Tax the county's voters approved two years ago. The LEC will have a detention center, along with offices, storage and other areas for all Sheriff's Department employees, Magistrate and staff, and a Magistrate's courtroom. An animal control facility will also be co-located on the property. Construction of that facility is expected to start next month and is expected to be completed by late summer. The current Edgefield County detention center and Sheriff's Office was built in the early 1980s. The Magistrate's Office has also outgrown its facility and has never had a courtroom. Court has been held in the Magistrate's office or in County Council Chambers. _____________________________________________________________________________________________________________________________________________________________________ **As of October 18, 2022, the owner rejected all bids. The Project is approximately 66,000 SF of new facilities. It will house 134 inmates with a core designed for 200. The new sheriff's office (administrative offices, 911, and support areas) and magistrates court will also be within the building. There are two pre-engineered metal buildings on the site in addition to the main building. The main building construction includes concrete and brick veneer masonry construction with steel framing, interior CMU partitions, PVC roofing, architectural casework, food service equipment, detention equipment, security electronics, and finishes typically associated with a new detention center. The project includes a kitchen, laundry, vehicle sally port, intake/booking and steel cells. Sitework includes stormwater management, sidewalks, parking lots, grading, and fencing/gates. Mechanical work includes ductwork, plumbing, sprinkler system, smoke control system, controls, and roof top units. Electrical work includes panelboards, lighting fixtures, fire alarm, emergency generator, power, technology wiring and infrastructure; and security systems (cameras, intercoms, duress, door controls, and touchscreens). Submit any questions relating to the Bidding Documents shall be directed to the architect, Moseley Architects electronically. Responses to any questions/ clarification will be in the form of addenda if required. The last day for questions/clarifications shall be placed by the end of the day at 5:00 p.m. on September 7, 2022. Edgefield County reserves the right to reject all bids, to waive informalities and technicalities, and to cancel the Bid Process at any time.
Under Construction
Fire / Police
$36,610,271.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2022
June 13, 2023
124 Courthouse Square, Edgefield, SC
Related To This Project
Edgefield, SC
Bid Date: Sep 20 2022
Edgefield, SC
Bid Date: Dec 13 2022
Edgefield, SC
Bid Date: Jan 12 2023
Edgefield, SC
Bid Date: Mar 08 2022
Edgefield, SC
Bid Date: Mar 08 2022
Edgefield, SC
Bid Date: Apr 13 2022
Edgefield, SC
Bid Date: Apr 14 2022
Edgefield, SC
Bid Date: Nov 01 2022
Edgefield, SC
Bid Date: Nov 01 2022
Edgefield, SC
Bid Date: Nov 01 2022
Charleston, SC
--
Saluda, SC
Bid Date: Sep 21 2022
Greenville, SC
--
Little Mountain, SC
Bid Date: Oct 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.