BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a civil project in Shorewood, Minnesota. Working plans call for the renovation of a water / sewer project; for site work for a road / highway; and for paving for a road / highway.

Rehabilitation of Submersible Pump Lift Station and Valve Vault Construction 2 EA Bituminous Patching and Driveway 20 TON Electrical Construction Related Pipe Construction and Restoration The work included in the project shall include the furnishing of all required labor and materials for a complete and operable electrical system as indicated on the accompanying drawings and as required by the project manual inclusive of all appurtenances not specifically shown or covered by the specifications but required for complete operation of the electrical system as defined in the documents. The work shall also include the testing, adjustment, start-up and troubleshooting of the electrical equipment and the training of the Owner's operating personnel in its operation and maintenance. It shall be the responsibility of the Contractor to furnish a complete and fully operating system. The Contractor shall be responsible for all details which may be necessary to properly install, adjust and place in operation the complete installation. The Contractor shall assume full responsibility for additional costs which may result from unauthorized deviations from the contract documents. Lift Station 7 is located at 5600 Woodside Lane on the west side of the cul-de-sac. According to information provided by Bolton & Menk, Inc., the existing lift station wet well and valve vault, which have a bottom elevation of 923.0 feet, are supported on an 18-inch thick, cast-in-place concrete base slab. The base slab dimensions are estimated to have dimensions of about 10 feet by 20 feet, according to information provided by Bolton & Menk. The proposed work at this location consists of demolishing the valve vault to approximately 10 feet below grade (existing grade is at about elevation 948 feet), filling the void space with flowable fill to approximately elevation 938.0 feet, and placing the new valve vault on top of the infilled structure. The flowable fill depth will be about 15 to 16 feet. The wet well would not be replaced.

Final Planning

Water / Sewer

$429,820.00

Public - City

Paving, Renovation, Site Work

21

26

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
82
Bidding Soon
778
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 6, 2021

January 31, 2022

img_map_placeholder

Multiple Locations, Shorewood, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.