BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 28, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Collierville, Tennessee. Conceptual plans call for site work for a water / sewer project.

This project will help stabilize approximately 1,800 linear feet of stream banks of the Queen Oaks Ditch beginning at the end of Queen Oaks Detention Pond and ending at Powell Road. The scope of work for FY 2024 would include the design to stabilize the ditch and banks in the project area. The design would include all permits including an Aquatic Resource Alteration Permit (ARAP), Storm Water Permit, Corps of Engineers permits and an easement acquisition. It is anticipated the design, permitting and easement acquisition would take several years. This would allow for construction to take place in FY 2025. As of December 28, 2022, this project is currently in the FY 2022 - 2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$800,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
58
Bidding Soon
662
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Queen Oak St, Collierville, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.