Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Homer, Alaska. Completed plans call for site work for a water / sewer project.
***As of December 20, 2021, the project has not yet been awarded. The project will be awarded on 1st week of January 2022.*** The proposed work is located within the limits of the City of Homer and is illustrated on the plans entitled Construction Drawings for City of Homer Alder Lane Water Main Extension. The project consists of furnishing all labor, materials, equipment, tools, supervision and other facilities necessary for the performance of the work described herein and shown on the project drawings. The work includes, but is not limited to: o Excavation required to bury a new water main at a depth of 7 feet and expose an existing water main connection so that the new water main can be connected to it. o Installation of 1,216 feet of 8-inch HDPE pipe rated for 125 psi and terminated by a gatevalve. The new pipe will be connected to the existing 6-inch HDPE stubout via an 8x6 HDPE reducer and bolted flange connection. o Installation of an 8-inch gate valve downstream of the reducer. o Installation of a fire hydrant within 6 feet of the termination point of the new water main. o Installation of 1-inch diameter copper service pipes to connect each of the properties to be serviced to the new water main. o Backfilling the trench with Class B Bedding directly around the water main itself. All remaining backfill must be Type II Classified Fill. o The following materials will be provided by the City. All other materials will be provided by the Contractor: 1. 1216 feet of 8 x 40 SDR11 HDPE pipe 2. Three 7' fire hydrants 3. Three 8" IPS SDR11 tees 4. Three 8" DI flanged gate valves 5. Six 8" IPS SDR11 flanged adapters 6. Six 8" AWWA 304SS backing rings 7. Three 6" IPS SDR11 flanged gate valves 8. Six 6" IPS SDR11 flanged adapters 9. Six 6" AWWA 304SS backing rings 10. Eight polycam 415 saddles 11. Four 8 x 6 IPS SDR11 reducers Note that the plans call for three molded reducing tees, but supply shortages meant that shipping times for molded reducing tees would be very long. Instead, three 8" tees and three 8 x 6 reducers are included to make the reducing tees. The cost range for the Alder Lane Water Extension Project is $200,000 - $300,000 The project consists of furnishing all labor, materials, equipment, tools, supervision, and other facilities necessary to perform the project in accordance with the plans and specifications. The work includes, but is not limited to the following: Installation of 1,216 feet of 8-inch HDPE pipe connected to an existing 6-inch HDPE stub out. Eight parcels must be provided a 1-inch diameter copper service connection. Please direct all questions in writing regarding this project to: Janette Keiser, PE, Public Works Director City of Homer Public Works Dept. 3575 Heath Street, Homer, Alaska 99603 Email: jkeiser@ci.homer.ak.us Phone: (907) 435-3141 The City of Homer reserves the right to accept or reject any or all bids, and to waive irregularities or informalities in the bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$269,930.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2021
December 28, 2021
Alder Ln, Homer, AK
Related To This Project
Homer, AK
Bid Date: Nov 30 2021
Homer, AK
Bid Date: Apr 30 2024
Homer, AK
Bid Date: Jan 05 2022
Homer, AK
Bid Date: Jun 04 2024
Homer, AK
Bid Date: Oct 25 2024
Homer, AK
Bid Date: Sep 06 2023
Homer, AK
Bid Date: Sep 07 2023
Homer, AK
Bid Date: Aug 17 2023
Homer, AK
Bid Date: Jun 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.