Published June 20, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Roosevelt, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Award Details Contract Award Date: Jun 10, 2022 Contract Award Number: 6982AF22C000026 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: G1NKCBXYFLH3 Contractor Awarded Name: Stormwater Plans, LLC Contractor Awarded Address: Glendale, AZ 85301-6014 USA Base and All Options Value (Total Contract Value): $17959492.00 Project Location The Apache Trail project consists of approximately 11.16 miles of AZ State Route 88 between Roosevelt Dam (MP 240) and Apache Lake Marina (MP 229) in Maricopa County, Arizona. State Route 88 is currently closed south of the project due to flood damage. Access for construction will be from the north. The figure below provides a visual summary of the project location. Scope of the Work The purpose of the project is to provide a hardened driving surface along the 11.16 miles while also improving sight distance with slope cuts in about 5 locations. The majority of the project will surfaced with a double chip seal on aggregate base, while some of the steeper sections will be asphalt paved. The project does not propose widening. Additionally, recent flood damage has required that several drainage features be improved. Numerous pipe culverts will be replaced and some will be upgraded to reinforced concrete box structures. The project involves a variety of emergency repair work including slope scaling, excavation, pipe culverts, reinforced concrete box culverts, ditch reconditioning, drainage repairs, riprap, chip seal, asphalt paving, erosion control, and revegetation. Items worth noting: This is a very narrow and winding section of road with steep grades and no shoulder in several locations. Coordination with public traffic will be required. Daytime delays will be a maximum of 15 minutes. Several drainage structures are currently completely plugged and the bench in portions of the project has been narrowed due to flood events in the Fall of 2019. State Route 88 south of the Apache Lake Marina is currently closed. ADOT has not indicated a timeline for reopening this segment and it therefore the project should not be assumed to be accessible from the south. One slope cut will likely require blasting techniques to excavate hard rock. The road has historic characteristics that will require archeological monitors for certain work items. Additionally, environmental resources exist adjacent to the road in several locations. Principal Work Items Approximate quantities for major work items: 16,000 cubic yards of roadway excavation 5,150 cubic yards of rip rap 111,000 square yards of chip seal 38,000 tons of roadway aggregate 6,200 tons of asphalt concrete pavement 3,000 square yards of concrete pavement (low water crossings with cutoff walls) 1,700 linear feet of pipe culvert 465 linear feet of reinforced concrete box culvert Anticipated Schedule Advertise: Late October Bid Opening: Early December Award: Late December Construction: Winter 2022 - Fall 2022 Funding The anticipated cost range is between $12,000,000 and $16,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The price range of the project work is between $10 and $16 million. PN - AZ FLAP SR88(1) Apache Trail

Award

Roads / Highways

$17,959,492.00

Public - Federal

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
34
Bidding Soon
978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

January 17, 2022

Project location map

Apache Trail, Roosevelt, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.