Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in High Point, North Carolina. Completed plans call for site work for a water / sewer project.
Bids are invited for work as follows as well as all related miscellaneous work: The Project scope is to perform demolition of 16 aerial segments (approximately 5,400 linear feet) of existing 48-inch welded steel pipe and 16 aerial segments (approximately 3,700 linear feet) of abandoned 30" cast iron pipe. Furnish and install approximately 5,400 linear feet of 48 ich welded steel pipe from the Eastside Wastewater Treatment Plant and other associated work. All miscellaneous work related to the above. Quantities and major work items are more thoroughly described herein. No proposal shall be considered or accepted by the City Council unless at the time of its filing the same shall be accompanied by a deposit with the City of High Point of a certified check on a bank or trust company insured by the Federal Deposit Insurance Corporation, in an amount equal to five percent (5%) of the total bid. In lieu of making the deposit as above provided, such bidder may file a bid bond executed by a corporate surety licensed under the laws of North Carolina to execute such bonds; conditioned that the surety will upon demand forthwith make payment to the City of High Point upon said bond if the bidder fails to execute the contract in accordance with the bid bond. This deposit shall be retained if the successful bidder fails to execute the contract within ten (10) days after award or fails to give satisfactory surety as required herein. A separate performance and payment bond each in an amount equal to one hundred percent (100%) of the contract price will be required after bid award. The City reserves the right to reject any and all bids, as may in the judgment of the City, serve its best interest and the City further reserves the right to waive irregularities and informalities in any bid submitted. Questions will still be received until 7/13 3:00pm
Bid Results
Water / Sewer
$16,387,400.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2021
September 27, 2021
To Be Determined, High Point, NC
Related To This Project
High Point, NC
Bid Date: May 20 2020
High Point, NC
Bid Date: Apr 03 2019
High Point, NC
--
High Point, NC
--
High Point, NC
Bid Date: Oct 19 2023
High Point, NC
Bid Date: Oct 19 2023
High Point, NC
--
High Point, NC
--
High Point, NC
Bid Date: Jun 16 2022
High Point, NC
Bid Date: Jul 13 2022
High Point, NC
Bid Date: Jul 27 2022
High Point, NC
--
High Point, NC
Bid Date: Jul 29 2022
High Point, NC
--
High Point, NC
Bid Date: Jul 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.