BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2021 at 8:00 PM

Updated February 12, 2026

Renovation of a mixed-use development in Princeton, West Virginia. Completed plans call for the renovation of a educational facility.

Mercer County Technical School Seminar Center HVAC SUBSTANTIAL COMPLETION: The Bidder agrees to commence work upon receipt of the Board's written Notice to Proceed and/or Purchase Order, to Substantially Complete work by October 15, 2021 and to achieve Final Completion within 15 consecutive calendar days thereafter The contractor agrees that from the compensation otherwise to be paid, the Mercer County Board of Education may retain a sum in accordance with the following schedule for each day thereafter, Sundays and Holidays included, that the work remains uncompleted, which sum if agreed upon as the proper measure of liquidated damages which the Mercer County Board of Education will sustain per diem by failure of the contract to complete the work at the stipulated time and the sum is not to be construed in any sense a penalty. For each calendar day of delay in achieving Substantial Completion, the Contractor shall be liable for and pay the Board $150.00 per day, not as a penalty, but as liquidated damages. Provide a Performance Bond and a Material and Labor Payment Bond for 100% of the contract award. BID BOND: Each Bid shall be accompanied by a Bid Bond payable to the Mercer County Board of Education for five percent (5%) of the total Bid issued by a solvent surety company listed on the most current Federal Register, Circular 570, and authorized to do business in the State of West Virginia. Should the bidder refuse to enter into a contract with the West Virginia Board of Education on the terms stated in the Bidding Documents or fail to furnish bonds covering faithful performance of the Contract and all obligations arising from the full amount of the Bid Security shall be forfeited to the Mercer County Board of Education as liquidated damages, not as a penalty. BID WITHDRAWAL after the scheduled closing time for receipt of Bids, no Bid may be withdrawn for a period of 90 days. The Board reserves the right to add elements of work to the Bid anytime during the 90- day period based upon mutual agreement between the Board and the bidding contractors. The Mercer County Board of Education shall have the right to reject any or all Bids and to reject a Bid not accompanied by the required Bid security, or by other data required by the Bidding Documents, or to reject a Bid which is in any way incomplete or irregular.

Award

Educational

$19,158.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
71
Bidding Soon
819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2021

August 19, 2021

Project location map

1397 Stafford Dr, Princeton, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.