Site work and outdoor lighting for a transportation facility in Seattle, Washington. Completed plans call for site work for a transportation facility; and for outdoor lighting for a transportation facility.
Contract Title: Electrical Upgrades Phase III Synopsis: Work includes installation of new in pavement runway guard lights, replacing existing elevated runway guard lights with LED lighting at Taxiway B1, B5 and B10; installation of a new ALCMS system in the Electrical Vault and Air Traffic Control Tower including trenching and new cabling between; and miscellaneous marking obliteration and painting for temporary and permanent markings. Engineer’s Estimate: $2,419,22 Work site: King County International Airport, 7277 Perimeter Rd S. Seattle, WA 98108 Bid Guaranty: Not less than five percent (5%) of the Total Bid Price *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Bidder to whom the County issues the Intent to Award for this Contract shall furnish a Performance and Payment Bond, in accordance with §00 52 00, only on the form provided in §00 61 00, in the amount of 100% of the Contract Price, including any and all adjustments to the Contract Price, as security for the faithful performance and completion of the work. Such bond must be executed, dated and sealed by a duly licensed surety(ies) which is registered with the Washington State Insurance Commissioner, and the surety's(ies') name shall appear in the current Authorized Insurance Company List in the state of Washington published by the Office of the Insurance Commissioner. Contract Work (112 Calendar Days) – This work consists of all work shown on the Construction Drawings, including the items below. This work will be considered complete once all equipment is in place, operational, and useable by the Airport and the work is considered Substantially Complete as defined in the General Terms & Conditions. 1. Re-cabling of the Runway Guard Light at B1, B5 and B10. 2. Installing new in-pavement and replacing existing elevated RGLs with LED units at Taxiway Connectors B1, B5, and B10. 3. Installing a new ALCMS system and associated new cabling in and between the electric vault and air traffic control tower. 4. Saw cutting existing asphalt, pavement demolition, and open trench excavation. 5. Removing pavement markings and installing paint & thermoplastic markings. 6. Clean up and site restoration Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Last Date for Questions 3/26/24 04:00:00 PM CANCELLATION OF ITB OR REJECTION OF BIDS A. Bidders are advised that the County reserves the right to: 1. Cancel the procurement at any time prior to Contract Execution, or 2. Reject any and all bids for good cause, including, but not limited to: (a) any bid which contains any omission, erasure or irregularity; (b) any bid which has any qualification, addition, limitation, or provision attached to or contained in the bid; (c) any bid in which prices are unbalanced in the opinion of the County; (d) any bid accompanied by insufficient or irregular bid guaranty; (e) any bid found non-responsive by the County; (f) any Bidder found by the County to be not responsible; (g) any bid for which a Bidder fails or neglects to complete and submit any qualifications information within the time specified by the County and as may be otherwise required herein. B. In submitting a bid, a Bidder acknowledges and agrees that it is not entitled to any compensation, costs, or damages relating to bid preparation or resulting from the County’s decision to cancel a bid or procurement or refusal to execute a contract. C. All costs incurred in the preparation of a Bid and participation in this procurement shall be borne by the bidders
Post-Bid
Transportation Terminals
$2,419,222.00
Public - County
Outdoor Lighting, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
June 3, 2024
7277 Perimeter Rd S, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Apr 12 2023
Seattle, WA
Bid Date: May 16 2023
Seattle, WA
Bid Date: May 18 2023
Seattle, WA
Bid Date: May 23 2023
Seattle, WA
Bid Date: May 02 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: May 15 2023
Seattle, WA
Bid Date: May 18 2023
Seattle, WA
Bid Date: May 15 2023
Seattle, WA
Bid Date: Jun 23 2023
Seattle, WA
Bid Date: May 25 2023
Seattle, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.