Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Bristol, New Hampshire. Completed plans call for site work for a water / sewer project.
The New Hampshire Fish and Game Department (NHFG) requires an autumn 2021 extraction and spring 2022 install of three (3) temporary steel extension piles for the seasonal dock at NHFG's Wellington State Park boat ramp in Bristol, NH that accesses Newfound Lake. In addition, the NHFG seeks assistance retrieving and deploying the seasonal floating dock and gangway system associated with the extension piles. The assistance can be provided without resetting the crane position or configuration. Questions about the project may be submitted by email to Garret Graaskamp (NHFG Statewide Boat Access Program Coordinator) at garret.graaskamp@wildlife.nh.gov no later than 4:00 pm on Wednesday, June 30, 2021. The Contractor shall provide all necessary and appropriate strapping or cabling ("strapping") to NHFG personnel for securing to the dock segments, gangway and extension piles to complete this project. NHFG will provide a boat to support the extension pile and dock retrieval/deployment activity as needed. The Contractor will not need to supply a diver. The dock consists of two (2) eight (8) foot wide by twenty (20) foot long by two and one half (2.5+/-) foot deep floating dock segments. When in service the two segments are bolted to each other and are accessed from shore by a thirty (30) foot long by four (4) foot wide aluminum gangway. The dock segments weigh approximately 4,500 to 4,800 pounds each. Each dock segment has pile slots enclosed by a piece of decking that can be removed to receive piles. The outer pile is secured to the outer-lake-end of the dock segment via a removable metal chain that attaches to the end of the dock segment and surrounds the pile. Please refer to the pictures in the supporting documents. Each seasonal extension pile is steel pipe with an 8.625-inch OD and 0.375-inch thick walls; about 16 feet long and weighs about 600 pounds. They are fitted into permanent 10-inch ID steel pipes ("sleeve piles") located below water. The top of each extension pile has a centrally located pick point ring. The nominal dimensions of the inside opening of the ring are 2-inch wide by 5-inch tall; and the diameter of the steel-ring-bar is 1.5-inch. The distance to the furthest piling is about 80 feet from the shoreline. The winter storage area in the parking lot for the dock segments is about 80 feet from shore. The water depth varies from 4 to 7 feet at the pile locations. There is an underground electric wire between the restroom and the overhead light at the ramp. Other than the overhead light at the ramp, there are no overhead wire lines in the vicinity of the set up location. Contractor is responsible for protecting all facility infrastructure including, but not limited to, the concrete ramp surface, dock abutment and asphalt pavement during project activities and for repairing any damage that may occur. NHFG will determine the actual dates of pile extraction and installation based on department resources, weather and ice-out conditions. The contractor shall work cooperatively with NHFG to schedule and complete the activity promptly after notification to proceed. The anticipated schedule is as follows: Extraction- During the week of Columbus Day (October 12 to 15, 2021) Installation- As soon as possible in April or early May 2022, subject to ice-out on Newfound Lake.
Bid Results
Water / Sewer
$3,225.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2021
August 9, 2021
614 W Shore Rd, Bristol, NH
Related To This Project
Bristol, NH
Bid Date: Jul 23 2020
Bristol, NH
Bid Date: Oct 15 2024
Bristol, NH
Bid Date: Jun 22 2023
Bristol, NH
Bid Date: Jul 29 2022
Concord, NH
Bid Date: Aug 10 2021
Concord, NH
Bid Date: Jul 20 2021
Concord, NH
Bid Date: Aug 20 2021
Concord, NH
Bid Date: Aug 11 2021
Concord, NH
Bid Date: Jul 21 2021
Concord, NH
Bid Date: Aug 02 2021
Concord, NH
Bid Date: Sep 09 2021
Concord, NH
Bid Date: Sep 02 2021
Concord, NH
Bid Date: Aug 26 2021
Concord, NH
Bid Date: Jul 21 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.