Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Minooka, Illinois. Completed plans call for site work for a water / sewer project.
No bid shall be withdrawn after the opening of the proposals without the consent of the President and Board of Trustees for a period of forty-five (45) days after the scheduled time of closing bids. A certified check/bank draft drawn on a solvent bank, cashiers check or bid bond, payable without condition to the Village of Minooka in an amount not less than ten percent of the bid shall be submitted with each proposal, as a guarantee that, if the proposal is accepted, a contract will be entered into and the performance of the contract is properly secured. A performance bond in a sum equal to one hundred percent of the amount of the bid, with sureties to be approved by the President and Board of Trustees for the faithful performance of the contract, must be furnished by the successful bidder. All bids or proposals shall contain an offer to furnish a bond upon acceptance of such bid or proposal. The right is reserved to reject any or all proposals, to waive technicalities, to postpone the bid opening, or to advertise for new proposals, if in the judgment of the President and Board of Trustees their best interests will be promoted thereby. The Contractor is advised that no work can begin on the project until the Village obtains all required permits. The Contractor will be required to pay not less than the prevailing wage rates on this project as established by the Illinois Department of Labor. The Contractor shall also comply with all applicable Federal, State and local regulations. Prequalifications will be required to be submitted to the Engineer by all potential bidders prior to receiving contract documents. If in the opinion of the President and Board of Trustees, an applicant would not be able to serve the best interest of the Village of Minooka, a proposal will not be issued to the applicant.
Post-Bid
Water / Sewer
$722,305.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2022
May 19, 2022
Rio Poco Ave, Minooka, IL
Related To This Project
Minooka, IL
Bid Date: Apr 01 2022
Minooka, IL
Bid Date: Mar 14 2022
Minooka, IL
Bid Date: Mar 14 2022
Minooka, IL
Bid Date: May 11 2022
Minooka, IL
Bid Date: Apr 13 2022
Minooka, IL
Bid Date: Sep 09 2022
Minooka, IL
Bid Date: Sep 24 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.