Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 1, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Ottawa, Ontario. Contact the soliciting agency for additional information.

KF01-Exit Stairwell Repairs / Foundation and Exterior Stone Stairs Repairs. The curved exit stairwell shall be properly fire separated from the remainder of the building. Fireproofing shall be provided around all openings/gaps in the wall and floor slab, and gaps between the floor and wall. Fireproofing rating shall meet the exit stairwell fire rating requirements. Handrail to be removed and replaced on both sides of the curved stairwell and shall be as per the latest National Building Code. TIMELINE: Project has not been publicly tendered. Project may be followed once approved to bid. Coverage of this report is discontinued at this time.

Award

Municipal

$1,527,000.00

Public - Federal

Renovation, Service, Maintenance and Supply, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
77
Bidding Soon
1,094
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed