BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2021 at 8:00 PM

Updated August 29, 2025

Site work, paving and outdoor lighting for a mixed-use development in Battle Ground, Washington. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project has been awarded to Halme Excavating, Inc. in the amount of $269,587. The construction to the north side of SW 3rd Street, between SW 17th Avenue and SW 19th Avenue, will consist of construction of curb and gutter, sidewalk, and planter strip. Additionally, the roadway will be widened to current standards and LED street lights will be installed. All bid proposals, over $100,000, shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Battle Ground Transportation Fund. The City of Battle Ground in accordance with the provisions of Title VI of the Civil Rights Act of 1964 and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. This project is financed through the Community Development Block Grant Program with funds obtained from the U.S. Department of Housing and Urban Development. The contract will be subject to regulations of the Departments of Labor and Housing and Urban Development. Attention is called to Federal provisions for Equal Employment Opportunity, HUD Section 3 requirements, and the minimum wages as set forth in the contract documents. The contractor will be required to indemnify and hold harmless the City of Battle Ground in connection with the performance of the contract and provide for the City to be named as an additional insured on commercial general liability at least as broad as CG00 01 and auto liability policies at the required amounts as outlined in the contract. Informational copies of maps, plans, specifications and insurance requirements are on file for inspection in the Public Works - Engineering office in Battle Ground, Washington. For project information, please contact Ryan M. Jeynes, PE, City Engineer at (360) 342-5078.

Award

Roads / Highways

$269,587.00

Public - City

Outdoor Lighting, Paving, Site Work

26

7

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
47
Bidding Soon
1,030
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2021

August 6, 2021

Project location map

Multiple Locations, Battle Ground, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.