BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and addition to a water / sewer project in Bellaire, Texas. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

The work consists of providing the necessary labor, materials, equipment, and supervision to construct Phase II Wastewater Treatment Plant Expansion to 0.2 MGD in Fort Bend County Municipal Utility District No. 184. The site work contractor is responsible for all site work, including but not limited to construction of on-site force main piping, underground piping at Train No. 2; concrete pads and sidewalks; underground duct banks; pull boxes; modifications to the existing service/distribution rack and existing blower control panel; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not explicitly specified in the lease agreement, complete in place for a fully functioning plant. The lease of the 100,000 gallon per day package wastewater treatment plant shall include delivery and assembly of the plant with all accessories and equipment; the aeration basin; multi-stage digester unit; a final clarifier; additional disks for the existing tertiary filters; turbidimeters for the existing tertiary filters; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment; a third blower; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panel for equipment including the clarifier, modifications to the existing blower control panel; basin lighting; electrical conduits and conductors; all accessories, equipment, piping, etc. within the plant, complete as specified. Within the plant is all the plant related functions from the stub up for the force main upstream of the screening and flow splitting box, to the existing effluent piping connection downstream of the chlorine contact basin. The lease plant installation shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. At Train No. 2, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the plant between the stub up for the force main upstream of the screening and flow splitting box, to the existing effluent piping connection downstream of the chlorine contact basin. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed plant. All buried piping shall be installed with a flanged stub-up approximately 18-inches (18) above finished grade at all locations or connected to the buried clarifier hopper for piping coming from the clarifier. The site work contractor shall perform all electrical work. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the pull boxes at Train No. 2. The plant lease contractor is responsible for all electrical work downstream of the pull boxes at Train No. 2. The plant lease contractor is also responsible for running all electrical wires from the leased equipment to the service rack in the underground duct bank provided by the site work contractor. No cable splice is allowed at the pull boxes. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. Bidder shall indicate on the bid form the substantial completion time. Final completion shall be achieved within 30 calendar days of substantial completion. Substantial completion time will be considered by the Owner in evaluation of the bid.

Bid Results

Water / Sewer

$1,025,400.00

Public - City

Addition, Demolition, Site Work

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
60
Bidding Soon
2,713
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2021

September 6, 2021

img_map_placeholder

To Be Determined, Bellaire, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.