BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in Avon, Colorado. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

https://www.vaildaily.com/news/eagle-valley/avon-plots-improvements-to-recreation-center-park-and-streets/ Over the past few years, the town has invested a lot of money into Harry A. Nottingham Park, seeking to make it a go-to amenity for residents and visitors. However, the town still has bigger plans for its future. This summer, the town has several ongoing projects. One of those is landscaping improvements to the west end of the park, which started April 1. According to Hildreth, the $318,000 project is nearing completion and included upgrades to landscaping, replacing the softball field with a multi-use athletic field, the addition of a new picnic and seating area, updates to the irrigation system and more. This summer, one of the main visible projects in the park is the demolition of the old Town Hall. While behind schedule, the project has a budget of $643,359 to clean the site and prepare it for future development. It should be completed this fall. Currently, the town has involved Zehren and Associates to design what’s next for the site. While no decisions have been made, the Town Council did provide direction. Council supported a design plan that contained minimal development but did include restrooms, parking, a large green space, new walkways and something that maintains the new views of Beaver Creek from the park. Construction of this space is estimated for spring 2022 and currently has nearly $1.3 million allocated in the five-year capital improvements budget. “I think it’s pretty profound what’s happening out there. The [old town hall] building is no longer there, the trees look huge all of the sudden, and there’s quite a few more views, particularly to the south,” said Pedro Campos, principal with Zehren and Associates. “It started shifting our thinking; I speculated that once the building came down we might learn some things and think about [this space] differently, and I think that’s happening.” The pavilion has also been undergoing a few improvements this summer, including the installation of a new concrete slab, tile repairs and a new railing. It is expected to be completed by the end of July and stay within its budget of $425,600. Going forward, the town also has plans for a new restroom facility near the beach and volleyball courts. Still pending public comment, design and design review, the restrooms have a total budget of $500,000 between 2021 and 2022. Construction is expected to start in September 2022. As the park grows in popularity, the town and Town Council are also looking at additional programming and improvement opportunities. On Aug. 3, the town’s Planning and Zoning Commission is walking the park, alongside interested members of council, to discuss the park’s future. _________________________________________________________________________________________________________________________________________ Installation of 30 bollard lights in harry a. Nottingham park. Installation includes bases, conduit, wiring and panel upgrades. Question Acceptance Deadline 07/12/2021 07:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required - Contractors License Required - Warranty Information Required - Installation Required - License Required

Award

Playgrounds / Parks / Athletic Fields

$242,221.00

Public - City

Outdoor Lighting, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
17
Bidding Soon
226
All Active Projects
100
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2021

August 16, 2021

img_map_placeholder

414 W Beaver Creek Blvd, Avon, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.