BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2022 at 7:00 PM

Updated January 25, 2024

Site work and paving for a sidewalk / parking lot in Avon, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction of six (6) concrete bus shelter pads and setting a new pre-fabricated bus shelter on each pad per engineered drawings. Surveying, saw cutting, excavation and disposal of existing concrete, shallow utilities and possible sprinkler line relocation, seeding/mulching, and safety barricades to control traffic and pedestrians are the general tasks required. All are located at existing bus stops in the Town of Avon as follows: - Shelter #1 Loaded Joe's - 180 Benchmark Road - Shelter #2 ANB Band - 70 Beaver Creek Place - Shelter #3 Avon Crossing/Canyon Run - 0170 Hurd Lane - Shelter #4 Eagle Bend North - 4650 Eagle Bend Drive - Shelter #5 West Gate Plaza - West Beaver Creek Blvd. - Shelter #6 Buffalo Ridge West - Building 3 Swift Gulch Road Job Location Town of Avon General Requirements - Bid Deposit Required - Contractors License Required - Insurance Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Labor and Materials Bond 100 % - Payment Bond 100 %

Award

Sidewalks / Parking Lot

$202,969.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
23
Bidding Soon
354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2022

October 19, 2022

Project location map

Multiple Locations, Avon, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.