Published February 3, 2022 at 7:00 PM

Updated November 14, 2023

Renovation of a water / sewer project in Arlington, Washington. Completed plans call for the renovation of a water / sewer project.

Work under this contract includes conversion of Arlington Water Reclamation Facility membrane basin #6 into a permeate equalization basin, adding effluent controls and monitoring systems, installation of a reclaimed water metering system, and replacing the existing digested sludge pumps and piping with positive displacement pumps and piping. The Engineers estimate for the complete project is $1,397,000.00. Please address any comments and questions in writing to the Project Administrator, Linda Taylor at ltaylor@arlingtonwa.gov. All bidding and construction are to be performed in compliance with the Contract Documents for this project and any Addenda issued thereto, which are on file with the City of Arlington Public Works Department. All proposals must be accompanied by a bid deposit in the form of a certified or cashiers check, or bid bond, for not less than five percent (5%) of the total amount bid, including additives and alternates, if any. Refer to Instructions to Bidders for more information. Should the successful Bidder fail to enter into such contract and furnish satisfactory payment and performance bonds within the time stated in the specifications, the bid deposit shall be forfeited to the City of Arlington. The City of Arlington expressly reserves the right to reject any and all bids, to waive minor irregularities or informalities, and to further make award of the project to the lowest responsible Bidder as it best serves the interest of the City of Arlington. No proposal may be withdrawn after the time stated above, or before Award of Contract, unless said award is delayed for a period exceeding sixty (60) calendar days after opening of the proposals, or Bidder withdraws proposal due to error in accordance with Section 1-03.1 of the WSDOT Standard Specifications. All work under this Agreement is to be done within 120 working days of notice to proceed.

Award

Water / Sewer

$1,460,978.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Common Work Results for Existing Conditions
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Grouting
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Identification for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Enclosed Switches and Circuit Breakers, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Power Converters, Power Filters and Conditioners, Chokes and Inductors, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
53
Bidding Soon
1,560
All Active Projects
649
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2021

September 13, 2021

img_map_placeholder

To Be Determined, Arlington, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.