BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Clifton Springs, New York. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Covid-19 Construction: To the extent required by SED guidance and other applicable law, construction shall continue as long as each contractor complies with social distancing requirements, cleaning and disinfecting protocols, and all applicable law and protocols in connection with COVID-19 exposure control at the job-site. Any Bidder upon returning such set in good condition within seven (7) days after the date set for Bid opening will be refunded the deposit. Midlakes CSD reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the Owner, all in accordance with applicable law. Midlakes CSD further reserves its right to disqualify Bidders for any material failure to comply with the "Instructions to Bidders". A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that in the case the contract is awarded to him, he will within ten (10) days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and that Bidder shall not withdraw his Bid for a period of forty-five (45) days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. NYS DOL Prevailing Wage applies to this project. The work is tax exempt. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed subject to and in accordance with the contract requirements. Custom Bid Results Electrical Contract No. 1 Blackmon Farrell Electric Inc. - $218,000 HVAC/Plumbing Contract No. 2 HMI Mechanical Systems Inc. - $146,000 Low Voltage Contract No. 3 Blackmon Farrell Electric Inc. - $320,000

Award

Educational

$684,000.00

Public - City

New Construction, Site Work

99

14

28

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
61
Bidding Soon
972
All Active Projects
522
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2021

October 11, 2021

img_map_placeholder

1490 NY-488, Clifton Springs, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.