EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 3, 2024 at 7:00 PM

Updated April 18, 2024

Site work and paving for a transportation facility in Morrisville, North Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**Parent Project** Construction commenced with a ground-breaking ceremony on October 11, 2023. The Program involves the replacement of existing Runway 5L-23R with a similar runway parallel to the existing, and approximately 535' to the northwest. Also included in the Program are the following major items of work: 1) Demolition of existing Runway 5L-23R and construction of a parallel taxiway in its location; and 2) Relocation of a portion of Lumley Road. The preliminary construction cost estimate range is $250M to $350M. Additional information regarding the Program is given in subsequent sections herein. Deadline for Submitting Written Inquiries: 4:00 pm, July 30, 2021 Questions and inquiries regarding the Program, the selection process, this RFQ, or any related matter may be directed to Ron Jewett, at ron.jewett@rdu.com. The Raleigh-Durham Airport Authority (Authority) has asked that each prospective proposer secure references from previous institutional construction project owners. The Authority is requiring that the references be completed on this form. Furthermore, the person completing this reference should be a Director, Administrator, or Vice-President of a public body or private firm for which this proposing firm has performed Construction Manager at-Risk (CMAR) services and should be available for a simple follow-up by phone or email from the Raleigh-Durham Airport Authority. Please assist Authority staff by answering the following questions to the best of your knowledge and return this questionnaire to the Authority by August 27, 2021. Short and concise answers are all that are necessary. You may transmit the questionnaire by scanning it and sending it via email or by sending a hard copy by U.S Mail or other parcel delivery using the appropriate delivery information provided below. The overall Program goal for DBE participation is twenty percent (20%). Written questions regarding addition in scope will be accepted until 4:00 pm on August 18.

Under Construction

Transportation Terminals

$350,000,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Erosion and Sedimentation Controls
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
68
Bidding Soon
1,104
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2021

October 16, 2023

img_map_placeholder

2205 Terminal Blvd, Morrisville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.