BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2021 at 8:00 PM

Updated September 9, 2025

Site work for a civil project in Hindman, Kentucky. Completed plans call for site work for a road / highway; and water / sewer project.

The Roger Combs AML Reclamation Project is planned to disturb up to 1.3 acres, and will consist of the stabilization of a landslide impacting the Roger Combs residential access drive and improvement of existing drainage control structures with the intention of limiting the infiltration of mine-related drainage into the landslide area, in order to slow or stop the further development or expansion of the landslide. The toe of the existing landslide mass will be partially excavated in order to facilitate the placement of concrete "Jersey" barriers and heavy stone backfill for the stabilization of toe of the landslide mass. An existing residential access road ditchline upslope from the landslide will be cleaned, and a culvert installed in order to safely discharge water from this ditchline into an existing hillside drainway, immediately below the residential access drive. Excavated earthen material from the project area will be transported to an existing previously utilized waste area located at the site of a dismantled Title V preparation plant, where the earthen material will aid in final reclamation. The proposed project disturbances will not impact any caves, cave-like habitats, or streams. The implementation and enforcement of standard AML Best Management Practices (BMPs) for Sediment and Erosion Control will prevent any significant amounts of sediments disturbed by project-related activities from entering area streams. A small number of trees may need to be disturbed at the outlet end of the proposed culvert. All areas to be disturbed by this project have previously been disturbed by one or more of residential construction, residential access construction, highway construction and/or coal-mining activities. Revegetation of all disturbed areas will be accomplished via the use of the AML Standard Reclamation Seed Mixture. Service Start : 7/21/2021 Pre-Construction Conference: No later than 10 calendar days after execution of the Contract a Pre-Construction Conference will be held at the Project Site or another convenient location. This meeting will be scheduled by the Owner through the A-E. Service End : 9/8/2021 For Information Call: Susan Ward 502-564-3050

Award

Water / Sewer

$43,000.00

Public - State/Provincial

Site Work

7

3

9

8

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
84
Bidding Soon
800
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2021

July 26, 2021

Project location map

Multiple Locations, Hindman, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.