BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 2, 2021 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Jarrell, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The "Eastwood Subdivision Sections 7 & 8" project includes the subdivision of approximately +-59.4 acres of land into approximately 346 residential units. This project includes street, water, sewer, and associated drainage improvements. Qualified Contractors are ENCOURAGED to provide Bids on BOTH packages. The deadline to ask questions is 7/26/2021 7:00 PM CDT A Cashier's Check, Certified Check, or Bid Bond payable to "SonWest Co." in an amount not less than five percent (5%) of the total bid must accompany the bid proposals as a guarantee that, if awarded the contract, the bidder will within ten (10) days of the award of the contract, enter into a contract and furnish an acceptable Performance and Payment Bond in the amount of one hundred percent (100%) of the contract price. The Bidder's Check will be forfeited and become the property of the Owner should the bidder fail to enter into a contract and furnish bonds acceptable to the Owner within ten (10) days after award of the contract. No proposals shall be withdrawn for a period of sixty (60) days after the opening of the bids. The Owner reserves the right to reject any and/or all bids and to waive all formalities in the bidding process. The Owner also reserves the right to determine which bid is lowest and the best, and to award the contract on this basis. It should be noted that time is of the essence on this project. A Maintenance Bond will be required in the amount of ten percent (10%) of the contract price and is to remain in force for a period of 1 year from the date of the letter of final acceptance from the District. A Maintenance Bond will also be required in the amount of ten percent (10%) of the contract price for the Street and Drainage Improvements to remain in force for a period of 2 years from the date of the letter of final acceptance from Williamson County The contract will include furnishing all labor; material, tools and equipment and performing all work for the Eastwood Subdivision Sections 7 & 8 (the "Project"). The project is located in the Sonterra MUD / Williamson County. Water, Wastewater, and Drainage Improvements will be opened publicly and Street Improvements will be opened privately.

Bid Results

Roads / Highways

$3,749,325.00

Public - City

Paving, Site Work

Subscribe For Documents

70 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
117
Bidding Soon
2,327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.