Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Coon Valley, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of Aug 24, 2021, the project has been awarded to Haas Sons Inc. $643,927.17. The start and completion date as not yet determined. Sealed bids, submitted in accordance with the Invitation for Bids for City Wide Street and Utility Reconstruction, Work for which bids are requested includes 1,420 of street reconstruction consisting of clearing and grubbing, removal of bituminous pavement, removal of curb and gutter, removal of concrete sidewalk, removal of concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete sidewalk, concrete driveway approaches, retaining walls, asphaltic concrete pavement, and boulevard restoration. 5% bid security is required. For questions regarding this project contact the Purchasing office, 203 S. Farwell Street, P.O. Box 5148, Eau Claire, WI 54702- 5148, telephone (715) 839-4957. Scope of work: Harless Road, from Drier Road west 300 feet. Reconstruction of Harless Road shall consist of removing the existing bituminous surface, sanitary sewer and services, water services, unclassified excavation, grading and graveling, concrete driveway approaches, asphaltic concrete pavement, and boulevard restoration. 2nd Street, from Cedar Street to Fountain Street. Reconstruction of 2 nd Street shall consist of removing the existing bituminous surface, removal of concrete curb and gutter, removal of concrete driveway approaches, removal of concrete sidewalk, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, retaining walls, asphaltic concrete pavement, and boulevard restoration. Cedar Street, from 2nd Street to 1st Street. Reconstruction of Cedar Street shall consist of removing the existing bituminous surface, removal of concrete curb and gutter, removal of concrete driveway approaches, sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, asphaltic concrete pavement, and boulevard restoration. Barbara Jean Drive, from Brookline Avenue east 350 feet. Construction of Barbara Jean Drive shall consist of sanitary sewer and services, water main and services, storm sewer, unclassified excavation, grading and graveling, concrete curb and gutter, concrete driveway approaches, concrete sidewalk, asphaltic concrete pavement, and boulevard restoration. All improvements to be constructed under Contract 2021-19 shall be completed by Friday, October 22, 2021. The Contractor shall maintain a continuous effort to complete the project once construction has commenced.
Award
Sidewalks / Parking Lot
$643,927.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 27, 2021
August 26, 2021
Multiple Locations, Coon Valley, WI
Related To This Project
Coon Valley, WI
Bid Date: Mar 03 2022
Coon Valley, WI
Bid Date: Mar 06 2020
Coon Valley, WI
Bid Date: Oct 26 2023
Coon Valley, WI
--
Coon Valley, WI
--
Coon Valley, WI
--
Coon Valley, WI
Bid Date: Jun 15 2021
Coon Valley, WI
Bid Date: Jun 15 2021
Coon Valley, WI
Bid Date: Apr 12 2022
Coon Valley, WI
Bid Date: Dec 13 2022
Washington, WI
Bid Date: Feb 14 2023
La Crosse, WI
Bid Date: May 27 2020
La Crosse, WI
Bid Date: Nov 30 2020
La Crosse, WI
Bid Date: Jun 18 2021
La Crosse, WI
Bid Date: Apr 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.