Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a development in Spirit Lake, Iowa. Completed plans call for site work for a development.
Project Description: Green Pastures Wetland Restoration Project - This project is designed to restore/enhance eight wetland pools on the Green Pastures tract of land near Center Lake in Dickinson County, Iowa. Work under this project includes earthfill (dike construction), excavation (channel/spillway), tile investigation, tile breaks, tile installation, water control structure, and erosion stone placement. The contractor shall provide all materials, labor, and equipment as specified to complete the project as specified below and in the contract documents. Project Location: The Green Pastures Tract of land is located between West Lake Okoboji and Center Lake in Dickinson Co. IA. Access is on the east side of the property off More specifically the project location is described as being in the NE 1/4, Section 12, T99N, Range 37W, Dickinson County, Iowa. See the location map in the plan set for more information 10"x8" Tee (Install Only) 1 EA 8" Dual Wall HDPE Riser (Install Only) 4 LF 4" Dia. Perforated Tile (Install Only) 100 LF Pipe Anchor 1 EA Antiseep Collar 1 EA 10" HD Bar Guard (Install Only) 1 EA 8" HD Bar Guard (Install Only) 2 EA Erosion Stone 45 TN Type 2.B Erosion Control Matting 963 SY Storm Water Permit & Pollution Prevention Plan Management Lump Sum Silt Fencing
Award
Conservation and Development
$39,347.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2021
August 16, 2021
To Be Determined, Spirit Lake, IA
Related To This Project
Spirit Lake, IA
Bid Date: Feb 17 2022
Spirit Lake, IA
Bid Date: Feb 17 2022
Spirit Lake, IA
Bid Date: Feb 17 2022
Spirit Lake, IA
Bid Date: Feb 10 2022
Spirit Lake, IA
Bid Date: Aug 21 2020
Spirit Lake, IA
Bid Date: Aug 07 2020
Spirit Lake, IA
Bid Date: Jul 12 2019
Spirit Lake, IA
Bid Date: Jul 19 2019
Spirit Lake, IA
Bid Date: Dec 15 2021
Spirit Lake, IA
Bid Date: Oct 05 2023
Spirit Lake, IA
Bid Date: Aug 03 2023
Spirit Lake, IA
Bid Date: Aug 03 2023
Spirit Lake, IA
Bid Date: Apr 18 2024
Spirit Lake, IA
Bid Date: Jun 22 2023
Spirit Lake, IA
Bid Date: Mar 16 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.