BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2021 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in Georgetown, Georgia. Completed plans call for site work for a water / sewer project.

Construction of the Waste Water System Improvements Division B for the Georgetown-Quitman County Water & Sewer Authority. The Work is generally described as follows: installation of bypass pumping at waste water treatment facility with necessary by-pass piping, demolition and removal of existing waste water lagoon liner, removal of existing geotextile fabric and under-liner ventilation tubing and miscellaneous hardware, installation of a new 60 mil HDPE liner +/- 5,000 square yards, removal and replacement of existing baffle curtain, pumping of existing sludge to roll off storage container, disposal of sludge is required and all other appurtenances associated with a complete installation. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with alternate bid items as indicated in the Bid Form. Contractor shall complete all Work as specified or indicated in the Contract Documents. Bid security shall be furnished in accordance with the Instructions to Bidders. All permits required for the construction of this project are expected to be approved prior to the date of full contract execution and notice to proceed. Acquisition of property for permanent easements and/or right of way is not expected to be required for this project. This project is expected to be funded all or in part by the Georgia Environmental Finance Authority's (GEFA) Clean Water State Revolving Fund loan. The construction contract will be subject to GEFA's Supplemental General Conditions for Federally Assisted State Revolving Loan Fund Construction Contracts including Disadvantaged Business Enterprise requirements and Davis Bacon & Related Act requirements. Additionally, the contract will be subject to GEFA's American Iron and Steel Special Conditions and Information for Federally. Bidding Documents also may be examined at Georgetown-Quitman Consolidated Government, during the Authority's regular business hours. Bidding Documents may be obtained from the Issuing Office during the hours indicated above, by calling 229-496-5700, or by requesting via email from cgriffin@stillwaterseng.com. Upon Issuing Office's receipt of payment, Bidding Documents will be sent via email or other means of electronic file distribution. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder's date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office.

Bid Results

Water / Sewer

$371,925.00

Public - County

Site Work

10

10

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
40
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2021

September 2, 2021

Project location map

Multiple Locations, Georgetown, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.