BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Estes Park, Colorado. Completed plans call for site work for a water / sewer project.

Contract Award Date: Jun 15, 2022 Contract Award Number: 140P2022C0056 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: FE4QVTUAN3R5 Contractor Awarded Name: B & H CONTRACTING COMPANY, INC. Contractor Awarded Address: Shannon, NC 28386-6007 USA Base and All Options Value (Total Contract Value): $19936941.4 ROMO/239689: Moraine Park Campground and HQ Utilities- Design-Build-GAOA Estimated Price Range: More than $10 million This project will rehabilitate the Headquarters East water system which includes the Moraine Park Campground (MPCG) water distribution systems. The project will address sewer pipes, manholes, the well, water treatment system, and water tanks serving the campground, Beaver Meadows Visitor Center, Park HQ East, and High Drive. This project will also replace the MPCG above-ground primary electrical distribution lines; address drainage issues at campsites; improve accessibility at campsites, comfort stations and vault toilets; rehabilitate a ranger station and entrance kiosk; add food lockers to campsites; add electric hookups to approximately 25 percent of campsites; add traffic calming improvements to roadways; add a third host site; add parking to the admin loop; and relocate campsites away from wetlands. The Park Headquarters East Water System and MPCG provides camping opportunities and potable water and fire flows/storage for campers staying at the 244 summer and 77 winter campsites, five comfort stations, ranger station, concessionaire- operated livery, park seasonal quarters, and private in-holder residence. The majority of the existing water distribution system and water storage tanks were installed in 1965 and are well past the components typical service life of 30 years. Repairs to the existing galvanized steel and cast-iron distribution at Moraine Park have become more frequent. The waterlines and components of the Moraine Park Water System are in very poor condition, primarily due to age and deferred maintenance. Several portions of the system are not buried to the appropriate depth and are thus subject to freezing and require monitoring to prevent problems. : It is anticipated that a Pre-Proposal Conference / Site Visit will be scheduled during phase 2 of the source selection process. It is currently anticipated the site visit will be conducted on or around 11/15/2021. Specific details regarding the site visit will be provided in the Phase 2 RFP.

Award

Water / Sewer

$19,936,941.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
34
Bidding Soon
957
All Active Projects
351
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2021

July 18, 2022

img_map_placeholder

US-36, Estes Park, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.