BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bells, Tennessee. Completed plans call for site work for a water / sewer project.

An official list of bidders will be maintained at portal to ensure eligibility requirements of the bidder are met prior to bid opening. Any bid submitted from a bidder not on the official bidders list and/or not containing the above information will not be opened. The owner reserves the right to waive any informality or to reject any or all bids. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. All bidders must be licensed General Contractors as required by the Contractor's Licensing Act of 1994 of the General Assembly of the State of Tennessee, and qualified for the type of construction being bid upon. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. City of Bells is an equal opportunity, affirmative action employer, drug-free with policies of non-discrimination on the basis of race, sex, religion, color, national or ethnic origin, age, disability or military service. This work consists of the method and process for furnishing all labor, materials, tools, equipment, and incidentals, necessary to provide for the complete rehabilitation of deteriorated sanitary sewer pipes by forming a new tight-fitting liner within the existing pipe. The process in a typical and general form consists of a flexible felt tube impregnated with an approved resin, which is inserted into an existing pipe. The curing may be accomplished by circulating heated water or air, curing resin system to affect the desired cure throughout the length of the tube, extending full-length from manhole to manhole. The resin should be cured into a hard, impermeable pipe of the desired thickness, providing a structurally sound, smooth interior and tight-fitting liner within the existing pipe. The lined pipe shall provide a hydraulic flow almost equal to, or greater than, the original new sewer capacity.

Award

Water / Sewer

$218,513.00

Public - City

Site Work

8

14

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
27
Bidding Soon
427
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2021

August 23, 2021

img_map_placeholder

Multiple Locations, Bells, TN

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.