BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Sault Sainte Marie, Michigan. Completed plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

The scope of this project includes, but is not limited to, the following: demolition of an existing lock chamber and construction of a new 110’ x 1200’ lock chamber including all operating machinery and auxiliary structures. Subcontracting opportunities exist in the areas of: Electrical systems, mechanical systems, hydraulic structures fabrication, structural steel fabrication, pre-engineered metal buildings, miscellaneous metals fabrication, commissioning, testing, piping systems, painting, architectural systems, drilling, grouting, and dewatering. This contract will contain a base bid item and seven optional contract line items (CLINS). The major components of the base include mobilization, batch plant set-up, cofferdam construction, relocations, care and diversion of water necessary to get the area to a dewatered state; construction of a New Power Plant Bridge; construction of a new shaft, Shaft 6; installation of Struts to stabilize the existing Lock walls; demolition of the existing Sabin Lock; excavation of rock and placement of a mud mat; construction of the Wide Wall Monoliths; fabrication and installation of the Upstream Ship Arrestors; fabricate, deliver, and install metals including miter gates and culvert valves; construction of phase one of the New Pump Well (including the demolition of the existing Davis Lock floor, rock excavation, , and construction of concrete structure to the operating floor). Option 1 includes the construction of the majority of Chamber Wall Monoliths, including the installation of embedded and post installed metals. Option 2 include the completion of the New Pump Well, including installation of all equipment, construction of the operating building, and rehabilitation of existing Davis and Poe pump wells. Option 3 includes the installation of air, steam, power, and hydraulic piping; commissioning and testing the miter gates, culvert valves, and Upstream Ship Arrestors; finalizing the site work; constructing the Lock Floor; and removal of the coffer cells. Option 4 includes installing solider pile and lagging, tie-back system, concrete cap, electrical infrastructure and bollards on the Downstream Approach Wall and East Center Pier. Option 5 is the installation of the Hands-Free Mooring system consisting of total of seven units on the North and South Walls including installation of dynamic units, cabling, equipment, associated software. Option 6 is the fabrication, installation, testing and commissioning of the Downstream Ship Arrestors. Option 7 includes excavation of rock and construction of a hybrid wall for the Alligator's Mouth expansion of the mooring area. The anticipated duration for the base is 1642 calendar days after the notice to proceed, an additional 365 calendar days will be provided if Option 1 is exercised and an additional 365 days will be provided if Option 3 is exercised. The Government intends to exercise all options. Options 4, 5, 6, and 7 are the last options to be exercised, and may be exercised as late as 1287 calendar days after the notice to proceed. As of October 1, 2024, Construction on phase 2 of this project has been completed and phase 3 is underway. A jloint-venture general contractor has been assigned for the project.

Under Construction

Water / Sewer

$1,300,000,000.00

Public - Federal

Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

59 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
58
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2022

April 3, 2023

img_map_placeholder

312 W Portage Ave, Sault Sainte Marie, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.