BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 23, 2022 at 7:00 PM

Updated April 18, 2025

Site work and paving for a mixed-use development in Watsonville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project consists of performing the following, including, but not limited to: Following underground utility project currently underway, surface improvements will be made, including curb ramp replacements, installation of traffic signal at Sydney Ave., upgrade APS at signalized crossings, lower signal shallow signal conduits, construction of a bus pullout, and grinding existing pavement and placing new hot mix asphalt. Limits of project are Alta Vista Ave. through the Green Valley Rd. intersection. The Engineer's estimate is three million dollars, ($3,000,000). Technical questions regarding the bid documents should be directed to Patrice Theriot, Principal Engineer, at the City of Watsonville Public Works and Utilities Department, 250 Main Street, Watsonville, California, at telephone number 831-768-3113, or by email patrice.theriot@cityofwatsonville.org. Bid Bond: 10% Performance Bond: 100% Payment Bond: 100% MBE Goal Percentage: 14.9% WBE Goal Percentage: 6.9% Project Duration: 120 Work Days Liquidated Damages: $2,500.00 Per Calendar Day The City of Watsonville affirms that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation.

Bid Results

Roads / Highways

$4,279,407.00

Public - City

Paving, Site Work

59

10

5

9

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
110
Bidding Soon
2,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2022

December 12, 2022

Project location map

Multiple Locations, Watsonville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.