Published January 5, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Nicholasville, Kentucky. Completed plans call for the renovation of a water / sewer project.

Question & answer deadline has been extended to July 30, 2021 close of business Lexington-Fayette Urban County Government that bids will be received for: Replacement of Dewatering Equipment at West Hickman WWTP Additional information may be obtained electronically or by calling (859) 258-3320. The project includes providing all construction supervision, labor, materials, tools, test equipment necessary for West Hickman WWTP Solids Handling Improvements. The project includes two alternate bids. Bid alternate one include the replacement three belt filter presses with two dewatering centrifuges, three polymer blending systems, replacement of approximately 220 lf of 6" ductile buried water line, replacement of (3) 220 lf 4" ductile iron sludge lines, installation of three screw conveyors, two magnetic flow meters, all associated electrical and instrumentation, This project also includes the conversion of storage space into an office with a dedicated minisplit HVAC unit, window replacements, trolley beam demolition. All work listed here together with all related work as specified and shown on the Drawings. It is therefore a request of each Bidder to include in its bid, the same goal (10%) for MWDBE participation and other requirements as outlined in this section. Bid question cutoff will be August 11, 2021

Under Construction

Water / Sewer

$426,833.00

Public - County

Renovation

63

25

17

12

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Grouting
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Bulk Material Feeders, Feeders, Mobile Plant Equipment, Trucks, Flatbed Trucks

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
56
Bidding Soon
678
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2021

September 20, 2021

img_map_placeholder

645 W Hickman Plant Rd, Nicholasville, KY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replacement of Dewatering Equipment at West Hickman WWTP

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.