BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Port Canaveral, Florida. Completed plans call for site work for a water / sewer project.

The Canaveral Port Authority is seeking proposals from qualified marine contractors to construct a berth at North Cargo Berth 3, Port Canaveral Florida. Question End Date 8/4/2021 5:00 PM The Work is generally described as follows: At North Cargo Berth 3, demolish the existing open pile pier and adjacent steel sheet pile wall system. Construct a new approximately 882 foot long deep combi-wall bulkhead berth with a pipe pile supported reinforced concrete relieving platform landside of the new berth wall. Project generally includes, cell fenders, bollards, shoreside and waterside mooring dolphins, earthwork and paving, stormwater conveyance system, potable water and force main wastewater utilities, high mast lighting system, fencing, and approximately 105,500 cubic yards of dredging with offshore disposal. The Request for Proposal (RFP) is a two step process. Step 1 is a Qualifications and Short-Listing Proposal process, and Step 2 is a Price Proposal process. Participation in Step 2 will be limited to Step 1 Proposers who were successfully short-listed. Project Budget is $35,500,000 (U.S. Dollars) not including alternates if any. The Canaveral Port Authority is seeking proposals from qualified marine contractors to construct a berth at North Cargo Berth 3, Port Canaveral Florida. The Work is generally described as follows: At North Cargo Berth 3, demolish the existing open pile pier and adjacent steel sheet pile wall system. Construct a new approximately 882 foot long deep combi-wall bulkhead berth with a pipe pile supported reinforced concrete relieving platform landside of the new berth wall. Project generally includes, cell fenders, bollards, shoreside and waterside mooring dolphins, earthwork and paving, stormwater conveyance system, potable water and force main wastewater utilities, high mast lighting system, fencing, and approximately 105,500 cubic yards of dredging with offshore disposal. This is a Lump Sum Price Contract with a contingency. The selected Proposer will be responsible for coordination with other construction contractors and for providing maximum support to the Canaveral Port Authority in maintaining their cruise and cargo operations at times specified by the Owner during construction. Other construction contracts are expected to be constructed simultaneously with the construction of the new cargo berth. The Scope of Services for the Proposer as part of this Request for Proposal includes all elements related to the scheduling, permitting, fabrication, installation, and testing of deep water cargo berths. It will be the responsibility of the awarded firm to coordinate their activities and schedules with the other contractors to minimize conflicts and delays. Special coordination and a high level of expectation by the Owner will be held on the selected Proposer to provide maximum coordination, support, and professionalism as multiple Contractors may require the use of the same space for construction. This Request for Proposal is a two step process. Step 1 consists of a Qualifications Package with required submittal information, which is detailed later in this section; Step 2 will be a Price Proposal, which will be submitted only by the firms that are successfully short-listed in the Step 1 process. A minimum of 2 firms will be short-listed for the Step 2 process. Preliminary information regarding the expectations for the Step 2 is included later in this section. It should be understood by all participating Proposers that the Canaveral Port Authority reserves the right to supplement, expand, and modify the Step 2 information and requirements prior to distribution in its final format to the short-listed firms. REHABILITATION, located at the West Access Channel, Port Canaveral, Florida. B. Budgeted funds for this project - $35,500,000.00 U.S. Dollars for the sea wall, dredging and cargo berth. C. Schedule for the Project will be 79 calendar weeks for scheduling, shop drawings, permitting, fabrication, installation, testing and completion of the project. D. Liquidated Damages will be assessed for non-compliance with the project Schedule.

Award

Water / Sewer

$52,545,531.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
46
Bidding Soon
880
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2021

November 23, 2021

img_map_placeholder

West Access Channel, Port Canaveral, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.