BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Port Canaveral, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of December 27, 2023, project was awarded to Ivey's Construction, awarded amount is $1,210,941.16.** PN-19-006 The Work is generally described as follows: New signals/mast arm assemblies &foundations, signalization components, cameras, wired and wireless communications, pavement markings, signage, and lane widening on Payne Way at the Payne Way/SR401 intersection. Beyond Payne Way intersection scope includes fiber interconnects, cameras, signal controller cabinet modifications, between Payne Way, Grouper Road, and Charles Rowland Blvd three intersections along SR401. The Owner reserves the right to reject all proposals with or without cause, to waive technical errors and informalities, and to accept the proposal that best serves the Owner. All questions about the meaning or intent of the Contract Documents shall be submitted in writing to Owner, using the VendorLink portal. Replies will be issued by Addenda through VendorLink to all parties recorded as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids will not be answered

Award

Roads / Highways

$1,210,941.00

Public - City

Paving, Site Work

40

8

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
100
Bidding Soon
1,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 22, 2023

January 22, 2024

Project location map

FL-401 & Payne Way, Port Canaveral, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.