EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a detention facility in Lincoln, Nebraska. Completed plans call for the renovation of a detention facility.

Exterior Building Repair. 1. Cutting and Patching. 2. Demolishing designated building equipment and fixtures. 3. Demolishing designated construction. 4. Cutting and alterations for completion of the Work. 5. Removing designated items for reuse and Owner's retention. 6. Protecting items designated to remain. 7. Removing demolished materials A. UNIT PRICE #1: Additional Masonry Tuckpointing: 1. Provide a Cost per Linear Foot to remove additional unacceptable mortar and tuckpointing joints at Scored face Concrete Masonry Units, per Specifications, which may be determined unacceptable by the Owner/Architect and are outside the scope of the contract. B. UNIT PRICE #2: Additional Replacement of Existing Sealant Joints with New Sealant: 1. Provide a Cost per Linear Foot to remove existing deteriorated sealant and backup material, provide and install new back-up material and silicone sealant for use at existing masonry sealant joints, per Specifications, as determined by the Owner/Architect and if outside the scope of the contract. C. UNIT PRICE #3: Additional Concrete Masonry Unit Patching: 1. Provide a Cost per Linear Foot to saw cut/grind out additional cracks in the Scored Face Concrete Masonry Units and patch with the vertical masonry repair mortar, per Specifications, which may be determined unacceptable by the Owner/Architect and are outside the scope of the contract. (Repair #1)

Bid Results

Jails / Prisons

$798,000.00

Public - State/Provincial

Renovation

23

13

11

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
43
Bidding Soon
408
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2021

February 7, 2022

img_map_placeholder

3216 W Van Dorn St, Lincoln, NE

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.