Site work for a civil project in Montville, Connecticut. Completed plans call for site work for a water / sewer project.

As of April 21,2023, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Montville will be accepting sealed bids for the Cook Hill Tank Replacement Project In general, the work consists of construction of a glass-fused-to-steel water storage tank and trihalomethane (THM) reduction equipment and associated electrical equipment adjacent to the existing Cook Hill Water Storage Tank, approximately 60-ft of water main to connect to the existing system, a 30 KW diesel standby generator, and a new electrical service. Construction of a glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank and approximately 30-ft of water main to connect to the existing system. MBE 6.0 percent ; WBE 2.5 percent The Work will be substantially complete within 245 days ; Final completion- 275 days Work Included: Construction of a new glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank. The major proposed work under this Contract includes: 1. Construction of the new 531,200-gallon water storage tank will include, but is not limited to: a. Excavation and installation of a new tank foundation; b. Construction of a glass-fused-to-steel water storage tank; c. Installation of an internal tank mixer, surface aerator and roof-top blower for ventilation of the air space; d. Installation of a new 3-phase electrical service; e. Installation of a new standby generator; f. Installation of an electrical enclosure for SCADA equipment; g. Installation of an electrical/control enclosure for the tank mixer, surface aerator, and roof-top blower; h. Connection of SCADA equipment enclosure to the existing antennas; i. Installation of 12-in water main and hydrant connecting the existing system to the new tank; j. Draining of existing water storage tank and disconnection from the water distribution system; k. Site work, including installation of a tank overflow channel and detention basin; l. Replacement of the existing chain link fence; m. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. n. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing chain link fence; b. Existing tank overflow channel; c. Piping and conduit, as indicated on the Drawings. 3. Maintain system flow processes as detailed in Part 3 of this section Addendum #1 has been issued as of 3-6-2023.

Bid Results

Water / Sewer

$2,040,250.00

Public - City

Site Work

34

22

4

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
642
Active Projects
240
Bidding Soon
4,673
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2023

June 12, 2023

Project location map

Cook Dr, Montville, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.