Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 21, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a civil project in Montville, Connecticut. Completed plans call for site work for a water / sewer project.
As of April 21,2023, this project has not yet been awarded. A timeline for award has not yet been established. The Town of Montville will be accepting sealed bids for the Cook Hill Tank Replacement Project In general, the work consists of construction of a glass-fused-to-steel water storage tank and trihalomethane (THM) reduction equipment and associated electrical equipment adjacent to the existing Cook Hill Water Storage Tank, approximately 60-ft of water main to connect to the existing system, a 30 KW diesel standby generator, and a new electrical service. Construction of a glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank and approximately 30-ft of water main to connect to the existing system. MBE 6.0 percent ; WBE 2.5 percent The Work will be substantially complete within 245 days ; Final completion- 275 days Work Included: Construction of a new glass-fused-to-steel water storage tank and THM reduction equipment adjacent to the existing Cook Hill Water Storage Tank. The major proposed work under this Contract includes: 1. Construction of the new 531,200-gallon water storage tank will include, but is not limited to: a. Excavation and installation of a new tank foundation; b. Construction of a glass-fused-to-steel water storage tank; c. Installation of an internal tank mixer, surface aerator and roof-top blower for ventilation of the air space; d. Installation of a new 3-phase electrical service; e. Installation of a new standby generator; f. Installation of an electrical enclosure for SCADA equipment; g. Installation of an electrical/control enclosure for the tank mixer, surface aerator, and roof-top blower; h. Connection of SCADA equipment enclosure to the existing antennas; i. Installation of 12-in water main and hydrant connecting the existing system to the new tank; j. Draining of existing water storage tank and disconnection from the water distribution system; k. Site work, including installation of a tank overflow channel and detention basin; l. Replacement of the existing chain link fence; m. Piping, site work, equipment systems, structures, instrumentation, control and electrical systems, as indicated on the Drawings. n. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Existing chain link fence; b. Existing tank overflow channel; c. Piping and conduit, as indicated on the Drawings. 3. Maintain system flow processes as detailed in Part 3 of this section Addendum #1 has been issued as of 3-6-2023.
Bid Results
Water / Sewer
$2,040,250.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2023
June 12, 2023
Cook Dr, Montville, CT
Related To This Project
Montville, CT
Bid Date: May 02 2023
Montville, CT
Bid Date: May 02 2023
Montville, CT
Bid Date: May 16 2023
Montville, CT
--
Montville, CT
Bid Date: May 23 2023
Montville, CT
Bid Date: Jun 06 2023
Montville, CT
Bid Date: Jun 16 2023
Montville, CT
Bid Date: Jun 23 2023
Montville, CT
Bid Date: Oct 26 2022
Montville, CT
Bid Date: Aug 31 2018
Montville, CT
Bid Date: Jan 27 2022
Montville, CT
Bid Date: Aug 30 2022
Montville, CT
--
Montville, CT
Bid Date: Jun 29 2022
Montville, CT
Bid Date: Mar 24 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.