Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 8, 2022 at 8:00 PM
Updated October 1, 2024
Site work and new construction of a military facility in Fort Campbell, Kentucky. Completed plans call for the construction of a military facility; and for site work for a military facility.
W912QR21D0049 Billy W. Jarrett Construction Company, Inc. W912QR21D0050 Butt Construction Company, Inc. W912QR21D0051 Howard W. Pence, Inc. W912QR21D0052 PEM-Harkins JV LLP W912QR21D0053 Southeastern Industrial Barlovento JV-2, LLC W912QR21D0054 Zodiac-Poettker HBZ Joint Venture, LLC W912QR21D0055 ESA South, Inc. Description Replacement Overflow Fridge/Freezer. Built for a 25-year life cycle. It will be 3/4 freezer and 1/4 refrigerator space. The loading dock will be located to provide a turn-around for a tractor-trailer and convenient to access the fridge and freezers. These will be a ramp up to the loading dock. The freezers and coolers shall include an alarm system capable of either being tied into the existing Campbell BAS/DDC system or if not available, be capable of direct notification via email and phone to facility personnel indicating interruption of service. A new electric line service will be run. Furnish all materials, tools, labor costs, and other associated incidentals necessary to complete the Site Work and design requirements of the COLD STORAGE FACILITY as required by the contract document drawings and specifications. The period of performance for the project is 540 calendar days from notice to proceed. The cost range is between $500,000 and $1,000,000. PLEASE NOTE: This is for Design Bid Build construction services only.
Post-Bid
Military
$1,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2021
July 20, 2022

Georgia Ave, Fort Campbell, KY
Related To This Project
Fort Campbell, KY
Bid Date: Sep 27 2023
Fort Campbell, KY
Bid Date: Oct 23 2023
Fort Campbell, KY
--
Fort Campbell, KY
--
Fort Campbell, KY
Bid Date: Nov 29 2023
Fort Campbell, KY
Bid Date: Aug 14 2020
Fort Campbell, KY
Bid Date: Feb 11 2025
Fort Campbell, KY
Bid Date: Aug 04 2021
Fort Campbell, KY
--
Fort Campbell, KY
Bid Date: Feb 04 2022
Fort Campbell, KY
Bid Date: Apr 22 2021
Fort Campbell, KY
Bid Date: Jan 07 2022
Fort Campbell, KY
Bid Date: Sep 25 2023
Fort Campbell, KY
Bid Date: Sep 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.