Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Panama City Beach, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.
The City of Panama City Beach under the provisions of Section 287.055, Florida Statutes (the Consultant's Competitive Negotiation Act), hereby gives notice that it seeks qualification statements for professional services related to construction engineering and inspection of four major transportation projects in the Front Beach Road Community Redevelopment Area. Each Project will generally include construction of additional travel lanes, sidewalks, street lighting, signalization, landscaping, stormwater improvements, utility relocation, undergrounding aerial utilities, relocation and upgrades to sanitary sewer, potable water and reuse water systems, all as contemplated by the City's Front Beach Road Community Redevelopment Plan. The successful consultant(s) will provide independent CEI services for the following five (5) projects: three phases (Segments 4.1, 4.2, 4.3) of Front Beach Road from Lullwater Drive to Richard Jackson Blvd, one phase (Segment 2 of Powell Adams Road), the south half of Powell Adams Road and one phase (Segment 4.1), the Powell Adams Intersection. Segment 4.1 and 4.2, 4.1 Powell Adams Road intersection design firm as follows: Dewberry Engineers, Inc. and Gortemoller Engineering, Inc. Segment 4.3 Volkert, Inc; CPH, Inc. and Alf Coleman Road GPI Greenman-Pedersen, Inc. The Segments 4.1 and 4.2 will bid in 2022. Segment 4.3 will bid in 2023. Construction for Powell Adams Road is scheduled in 2025. Segment 4.1 -- Reconstruction of Front Beach Road east of Lullwater Drive to about Hills Road. Construction is scheduled to begin toward the middle of 2023. More than $14.309 million is funded for this project in the proposed 2023 CRA budget. Segment 4.2 -- Reconstruction of Front Beach Road east of Hills Road to about Lantana Street. Construction is scheduled to begin toward the end of 2023. More than $6.249 million is funded for this project in the proposed 2023 CRA budget. Segment 4.3 -- Reconstruction of Front Beach Road from Hutchinson Boulevard. Construction is scheduled to begin toward the end of 2023 or beginning of 2024. About $15.527 million is funded for this project in the proposed 2023 CRA budget. As of August 29, 2022, the design firms has been selected. Construction of the first segment is expected to commence by mid-year 2023.. All projects are on a five-year plan. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Roads / Highways
$600,000.00
Public - City
Outdoor Lighting, Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2023
Multiple Locations, Panama City Beach, FL
Related To This Project
Panama City Beach, FL
Bid Date: May 16 2019
Panama City Beach, FL
--
Panama City Beach, FL
Bid Date: Sep 26 2018
Panama City Beach, FL
Bid Date: Sep 09 2022
Panama City Beach, FL
Bid Date: Sep 22 2022
Panama City Beach, FL
Bid Date: Mar 10 2023
Panama City Beach, FL
Bid Date: Jan 19 2023
Panama City Beach, FL
--
Panama City Beach, FL
--
Panama City Beach, FL
Bid Date: Aug 11 2022
Panama City Beach, FL
Bid Date: Aug 10 2022
Panama City Beach, FL
--
Panama City Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.