BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Minneapolis, Minnesota. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The work of this project includes improving drainage to prevent the signal system form shorting out and prevent dripping underneath on the Target Field equipment. The MCUB participation goal for this contract is 9%. The work of this project includes improving drainage to prevent the signal system form shorting out and prevent dripping underneath on the Target Field equipment. CONTRACTOR shall complete the Work in the manner and within the time specified in the Contract Documents and furnish labor, materials, tools, appliances, and other items necessary or incidental to the Work required by or reasonably inferred from the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, and techniques of construction, except for means, methods, or techniques expressly detailed on the Drawings or explicitly required by the Specifications. 1. The CONTRACTOR will supply the necessary traffic control and obtain permitting from MNDOT, City of Minneapolis, Metro Transit, and any other permitting organizations. 2. Install drainage system through deck to storm sewer. 3. Contractor will core drill through concrete structural deck. 4. CONTRACTOR shall remove and replace existing damaged bollard. 5. CONTRACTOR shall remove section of track infill slab. 6. CONTRACTOR shall Drill holes along the bottom of the signal vaults. 7. CONTRACTOR shall remove and replace concrete pavement and subbase for below grade drainpipe installation. 8. CONTRACTOR shall connect drainage to existing storm sewer manhole. 9. Contractor shall connect drainage system to existing drip pans and junction boxes. 10. CONTRACTOR shall provide a 12-inch min. wide ADA truncated dome warning strip as called out on plans. 11. CONTRACTOR shall seal conduit openings in signal vault. 12. CONTRACTOR shall schedule concrete pavement work with CAR to avoid operational disruptions to Target Field. 13. CONTRACTOR shall coordinate work with the CAR. 14. CONTRACTOR will need rail insurance.

Award

Water / Sewer

$140,340.00

Public - State/Provincial

Site Work

15

14

2

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
86
Bidding Soon
784
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2021

September 9, 2021

img_map_placeholder

To Be Determined, Minneapolis, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.