BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated February 26, 2026

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a pipeline; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of February 25, 2026, a contractor has been selected for this project. Construction is expected to be completed by 2028. The project includes replacement of all concrete paving and underground infrastructure (including storm drainage, sanitary sewer, industrial waste, buried power lines, natural gas, domestic and fire watermains, fuel storage tanks, vaults, and handholes) in the trolley bus yard, while maintaining base operations. Metro’s Atlantic Base is located in Seattle’s Industrial District; situated on approximately six acres of land, it serves as Metro’s sole electric trolley bus parking and maintenance facility. Primary uses of the 24/7 facility include bus maintenance, storage for up to 200 electric trolley buses, fueling, and washing operations. Last Date for Questions 8/4/21 05:00:00 PM Small Business Requirements Apply Yes

Award

Sidewalks / Parking Lot

$45,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
95
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2021

March 2, 2026

Project location map

1555 Airport Way S, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.