Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated July 1, 2025
Site work, paving and outdoor lighting for a mixed-use development in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and sidewalk / parking lot.
PROJECT LOCATION: The former Flume Property between Myrtle Street and East Marginal Way in the Georgetown Neighborhood. PROJECT DESCRIPTION: Excavate and dispose of contaminated soil and construct bicycle, pedestrian, and park improvements including multi-use trail, pavement repair, off-leash dog park, and pedestrian lighting All bids rejected. A/E ESTIMATE: 1,700,000 to 1,900,000. INCLUSION PLAN: For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 22 Percent WMBE1 utilization rates based on completed projects. Question Submission Deadline:October 31, 2024, 5:00pm For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattie.gov or 2Ô6-684-4525. Back-up contact is Carmen Kucinski at carmen. kucinski@.seattle.gov or 206-684-0188. PRE-BID SITE INSPECTION/MEETING: There is no pre-bid site inspection meeting scheduled for this project. QUESTIONS: Questions must, be emailed by 5:00pm, on that Thursday before Bid opening. See City of Seattle Standard Specification 1-02.4(1) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question deadline - 17 April 2025 All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids and Bidders verified. Iliad - Bid Rejected , Non-Responsive Sunset Grill Construction-Bid Rejected, Claim of Error
Award
Sidewalks / Parking Lot
$2,143,056.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
May 23, 2025
E Marginal Wy S & S Myrtle St, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Nov 18 2021
Seattle, WA
Bid Date: Dec 07 2021
Seattle, WA
Bid Date: Sep 23 2021
Seattle, WA
Bid Date: May 03 2021
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Oct 16 2024
Seattle, WA
Bid Date: Nov 22 2024
Seattle, WA
Bid Date: Nov 07 2024
Seattle, WA
Bid Date: Dec 05 2024
Seattle, WA
Bid Date: Oct 30 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
