BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated July 1, 2025

Site work, paving and outdoor lighting for a mixed-use development in Seattle, Washington. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and sidewalk / parking lot.

PROJECT LOCATION: The former Flume Property between Myrtle Street and East Marginal Way in the Georgetown Neighborhood. PROJECT DESCRIPTION: Excavate and dispose of contaminated soil and construct bicycle, pedestrian, and park improvements including multi-use trail, pavement repair, off-leash dog park, and pedestrian lighting All bids rejected. A/E ESTIMATE: 1,700,000 to 1,900,000. INCLUSION PLAN: For purposes of the Inclusion Plan, this is considered a Roadway type of project with a Past Performance of 22 Percent WMBE1 utilization rates based on completed projects. Question Submission Deadline:October 31, 2024, 5:00pm For questions on the Inclusion Plan please contact Miguel Beltran at Miguel.beltran@seattie.gov or 2Ô6-684-4525. Back-up contact is Carmen Kucinski at carmen. kucinski@.seattle.gov or 206-684-0188. PRE-BID SITE INSPECTION/MEETING: There is no pre-bid site inspection meeting scheduled for this project. QUESTIONS: Questions must, be emailed by 5:00pm, on that Thursday before Bid opening. See City of Seattle Standard Specification 1-02.4(1) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question deadline - 17 April 2025 All questions on the Inclusion Plan must be directed to Miguel Beltran at Miguel.beltran@seattle.gov or 206-684-4525. Backup contact is Carmen Kucinski at carmen.kucinski@seattle.gov or 206-684-0188 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bids and Bidders verified. Iliad - Bid Rejected , Non-Responsive Sunset Grill Construction-Bid Rejected, Claim of Error

Award

Sidewalks / Parking Lot

$2,143,056.00

Public - City

Outdoor Lighting, Paving, Site Work

32

8

2

7

Subscribe For Documents

109 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
65
Bidding Soon
1,739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 23, 2025

Project location map

E Marginal Wy S & S Myrtle St, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.